Nissan Juke Service and Repair Manual : Transaxle & transmission 6MT: RS6F94R

Service data and specifications (SDS)
General Specifications ...

Other materials:

Push-button ignition switch does not operate
Description Check that vehicle is under the condition shown in Conditions of vehicle before starting diagnosis, and check each symptom. NOTE: The engine start function, door lock function, power distribution system, and NATS-IVIS/NVIS in the Intelligent Key system are closely related to ...

C1111 ABS motor, motor relay system
DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If DTC CONFIRMATION PROCEDURE has been previously conducted, always turn ignition switch OFF and wait at least 10 seconds before conducting the next test. >> GO TO 2. 2.CHECK DTC DETECTION With CONSULT ...

Emission control not satisfactory
Description CHART 22: EMISSION CONTROL NOT SATISFACTORY Diagnosis Procedure 1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure". Is the inspection result normal? YES >> GO TO 2. NO >> Repair ...