Nissan Juke Service and Repair Manual : Park/neutral position (PNP) switch : Component Inspection

1.CHECK PARK/NEUTRAL POSITION (PNP) SWITCH

1. Disconnect position switch connector. Refer to TM-77, "Removal and Installation".

2. Check continuity between position switch terminals.


Is the inspection result normal?


Is the inspection result normal? YES >> INSPECTION END

NO >> Replace position switch. Refer to TM-77, "Removal and Installation".

    Back-up lamp switch : Component Inspection
    1.CHECK BACK-UP LAMP SWITCH 1. Disconnect position switch connector. Refer to TM-77, "Removal and Installation". 2. Check continuity between position switch terminals. Is the inspec ...

    Symptom diagnosis
    NOISE, VIBRATION AND HARSHNESS (NVH) TROUBLESHOOTING NVH Troubleshooting Chart Use the chart below to find the cause of the symptom. The numbers indicate the order of the inspection. If necessary, ...

    Other materials:

    LAN System can system (type 8)
    DTC/CIRCUIT DIAGNOSIS Main line between IPDM-E and DLC circuit Diagnosis Procedure 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the following terminals and connectors for damage, bend and loose connection (connector s ...

    Charge air cooler
    Exploded View 1. Air inlet hose 2. Clamp 3. Air inlet tube 4. Air inlet hose 5. Charge air cooler 6. Air inlet hose 7. Air inlet tube 8. Turbocharger 9. Air inlet tube assembly A. 1st step: 5.0 Nm (0.51 kg-m, 44 ft-lb) 2nd step: 7.0 Nm (0.71 kg-m, 62 ftlb) B. Paint mark C. T ...

    Seat belt buckle switch signal circuit (driver side)
    Component Function Check 1.CHECK COMBINATION METER INPUT SIGNAL Select the Data Monitor for the METER/M&A and check the BUCKLE SW monitor value. BUCKLE SW When driver seat belt is fastened : Off When driver seat belt is unfastened : On >> INSPECTION END Diagnosis Procedure ...