Nissan Juke Service and Repair Manual : Basic inspection

Wiring diagram
Engine control system For connector terminal arrangements, harness layouts, and alphabets in a (option abbreviation; if not described in wiring diagram), refer to GI-12, "Connector Informatio ...

Diagnosis and repair workflow
Work F OVERALL SEQUENCE DETAILED FLOW 1.GET INFORMATION FOR SYMPTOM Get the detailed information from the customer about the symptom (the condition and the environment when the incident/malfu ...

Other materials:

Thermo control amplifier
Component Function Check 1.CHECK A/C ON SIGNAL With CONSULT-III 1. Turn ignition switch ON. 2. Select AIR CONDITIONER of BCM using CONSULT-III. 3. Select THERMO AMP in DATA MONITOR mode, and check status under the following condition. Is the inspection result normal? YES >> ...

ASCD main switch
Component Function Check 1.CHECK ASCD MAIN SWITCH FUNCTION 1. Turn ignition switch ON. 2. Check the voltage between ECM harness connector terminals under the following conditions. Is the inspection result normal? YES >> INSPECTION END NO >> Go to EC-1009, "Diagnosis Proced ...

P0605 ECM
DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If DTC Confirmation Procedure has been previously conducted, always perform the following procedure before conducting the next test. 1. Turn ignition switch OFF and wait at least 10 seconds. 2. Turn ignition swit ...