Nissan Juke Service and Repair Manual : Unit disassembly and assembly
Unit removal and installation
Engine assembly Exploded View 1. Engine mounting assembly (RH) 2. Rear engine mounting bracket 3. Rear torque rod 4. Engine mounting bracket (LH) 5. Stud bolt 6. Engine mounting bracket ...Engine stand setting
NOTE: Explained here is how to disassemble with engine stand supporting transaxle surface. When using different type of engine stand, note with difference in steps and etc. 1. Remove the engine ...Other materials:
Water pump
Exploded View
1. Water pump
2. Gasket
3. Cylinder block
Removal and Installation
WARNING:
Never remove the radiator cap when the engine is hot. Serious burns could occur
from high pressure
coolant escaping from the radiator.
REMOVAL
1. Drain engine coolant. Refer to CO-62, "Drain ...
How to select piston and bearing
Description
• The identification grade stamped on each part is the grade for the
dimension measured in new condition. This grade cannot apply to reused parts.
• For reused or repaired parts, measure the dimension accurately. Determine the
grade by comparing the
measurement with the values o ...
C1120, C1122, C1124, C1126 ABS in valve system
DTC Logic
DTC DETECTION LOGIC
DTC CONFIRMATION PROCEDURE
1.PRECONDITIONING
If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn
ignition switch OFF and
wait at least 10 seconds before conducting the next test.
>> GO TO 2.
2.CHECK DTC DETECTION
With CONSULT ...