Nissan Juke Service and Repair Manual : Push-button ignition switch
Removal and Installation
REMOVAL
1. Remove the NATS antenna amp. Refer to SEC-167, "Removal and Installation".
2. Remove the push-button ignition switch.
1. Disengage the push-button ignition switch fixing pawls using minus driver etc.
2. Press the push-button ignition switch to remove it from cluster lid A (2).
: Pawl

INSTALLATION
Install in the reverse order of removal.
Nats antenna AMP
Removal and Installation
REMOVAL
1. Remove the cluster lid A. Refer to IP-13, "Removal and Installation".
2. Remove the NATS antenna amp.
1. Disengage the NATS antenna amp. (1) fixing ...
Other materials:
P0711 transmission fluid temperature sensor A
DTC Logic
DTC DETECTION LOGIC
DTC CONFIRMATION PROCEDURE
1.PREPARATION BEFORE WORK
If another "DTC CONFIRMATION PROCEDURE" occurs just before, turn ignition
switch OFF and wait for at
least 10 seconds, then perform the next test.
>> GO TO 2.
2.PERFORM DTC CONFIRMATION ...
Can communication
CAN COMMUNICATION : System Description
CAN (Controller Area Network) is a serial communication line for real time
application. It is an on-vehicle multiplex
communication line with high data communication speed and excellent error
detection ability. Many electronic
control units are equipped ...
P181F incomplete calibration
DTC Logic
DTC DETECTION LOGIC
DTC CONFIRMATION PROCEDURE
1.PRECONDITIONING
If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn
ignition switch OFF and
wait at least 10 seconds before conducting the next test.
>> GO TO 2.
2.DTC REPRODUCTION PROCEDURE
With ...

