Nissan Juke Service and Repair Manual : Security indicator lamp does not turn on or blink

Description

Security indicator lamp does not blink when ignition switch is in a position other than ON.

NOTE

:
• Before performing the diagnosis, check “Work Flow”. Refer to SEC-187, "Work Flow".

• Check that vehicle is under the condition shown in “CONDITIONS OF VEHICLE (OPERATING CONDITIONS)” before starting diagnosis, and check each symptom.

CONDITIONS OF VEHICLE (OPERATING CONDITIONS)

Power supply position is not the ON position.

Diagnosis Procedure

1.CHECK SECURITY INDICATOR LAMP

Check security indicator lamp function.

Refer to SEC-159, "Component Function Check".

Is the inspection result normal? YES >> GO TO 2.

NO >> Repair or replace the malfunctioning parts.

2.CONFIRM THE OPERATION

Confirm the operation again.

Is the result normal? YES >> Check intermittent incident. Refer to GI-42, "Intermittent Incident".

NO >> GO TO 1.

    Vehicle security system cannot be set
    Key fob KEY FOB : Description Armed phase is not activated when door is locked using keyfob. NOTE: Check that vehicle is under the condition shown in “CONDITIONS OF VEHICLE (OPERATING CONDIT ...

    Other materials:

    Wiring diagram
    HEATED SEAT SYSTEM Wiring Diagram For connector terminal arrangements, harness layouts, and alphabets in a (option abbreviation; if not described in wiring diagram), refer to GI-12, "Connector Information/Explanation of Option Abbreviation". ...

    P0190 FRP sensor
    DTC Logic DTC DETECTION LOGIC Diagnosis Procedure 1.CHECK GROUND CONNECTIONS 1. Turn ignition switch OFF. 2. Check ground connection E38. Refer to Ground inspection in GI-44, "Circuit Inspection". Is the inspection result normal? YES >> GO TO 2. NO >> Repair or ...

    For frontal collision : When SRS is not activated in a collision
    CAUTION: Due to varying models and option levels, not all parts listed in the chart below apply to all vehicles. WORK PROCEDURE 1. Before performing any of the following steps, ensure that all vehicle body and structural repairs have been completed. 2. Check the SRS components using the t ...