Nissan Juke Service and Repair Manual : L terminal circuit (short)

Description

The “L” terminal circuit controls the charge warning lamp. The charge warning lamp illuminates when the ignition switch is set to ON or START. When the alternator is providing sufficient voltage with the engine running, the charge warning lamp will go off. If the charge warning lamp illuminates with the engine running, a malfunction is indicated.

Diagnosis Procedure

1.CHECK “L” TERMINAL CIRCUIT (SHORT)

1. Turn ignition switch OFF.

2. Disconnect alternator connector.

3. Turn ignition switch ON.

Does charge warning lamp illuminate? YES >> GO TO 2.

NO >> Refer to CHG-12, "GASOLINE ENGINE MODELS : Work Flow" (gasoline engine models) or CHG-15, "DIESEL ENGINE MODELS : Work Flow" (diesel engine models).

2.CHECK HARNESS CONTINUITY (SHORT CIRCUIT)

1. Turn the ignition switch OFF.

2. Disconnect the battery cable from the negative terminal.

3. Disconnect combination meter connector.

4. Check continuity between combination meter harness connector and ground.

Is the inspection result normal?


Is the inspection result normal? YES >> Replace combination meter.

NO >> Repair the harness.

    L terminal circuit (open)
    Description The “L” terminal circuit controls the charge warning lamp. The charge warning lamp illuminates when the ignition switch is set to ON or START. When the alternator is providing sufficie ...

    S terminal circuit
    Description The output voltage of the alternator is controlled by the IC voltage regulator at the “S” terminal detecting the input voltage. The “S” terminal circuit detects the battery voltage ...

    Other materials:

    Engine does not start or starts with difficulty
    Description CHART 2: ENGINE DOES NOT START OR STARTS WITH DIFFICULTY Diagnosis Procedure 1.CHECK FUEL Check that the fuel reservoir is correctly filled and with the right fuel. >> GO TO 2. 2.CHECK BATTERY Check the battery. Refer to PG-124, "Removal and Installation". I ...

    ABS actuator and electric unit (control unit)
    Exploded View LHD 1. ABS actuator and electric unit (control unit) 2. ABS actuator and electric unit (control unit) harness connector 3. Bracket A. To master cylinder secondary side B. To master cylinder primary side C. To front LH caliper D. To rear RH caliper E. To rear LH caliper ...

    B2609 steering status
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PERFORM DTC CONFIRMATION PROCEDURE 1 1. Press push-button ignition switch under the following conditions and wait 1 second or more. - Selector lever: In the P position - Brake pedal: Not depressed 2. Check DTC in “Self Diagnostic ...