Nissan Juke Service and Repair Manual : C1130 engine signal

DTC Logic

DTC DETECTION LOGIC

DTC CONFIRMATION PROCEDURE


DTC CONFIRMATION PROCEDURE

1.PRECONDITIONING

If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn ignition switch OFF and wait at least 10 seconds before conducting the next test.

>> GO TO 2.

2.CHECK DTC DETECTION

1. Turn the ignition switch OFF to ON.With CONSULT-III.


1. Turn the ignition switch OFF to ON.

2. Perform self-diagnosis for “ABS”.

Is DTC “C1130” detected? YES >> Proceed to BRC-183, "Diagnosis Procedure".

NO >> INSPECTION END

Diagnosis Procedure

1.CHECK ENGINE SYSTEM

With CONSULT-III.

Perform self-diagnosis for “ENGINE”.

Is any DTC detected? YES >> Check the DTC.

NO >> GO TO 2.

2.CHECK ABS ACTUATOR AND ELECTRIC UNIT (CONTROL UNIT)

1. Erase Self-diagnosis result for “ABS”.With CONSULT-III.


1. Erase Self-diagnosis result for “ABS”.

2. Turn the ignition switch OFF and wait 10 second or more.

3. Start the engine and drive the vehicle for a short period of time.

4. Stop the vehicle.

5. Check that the malfunction indicator lamp (MIL) turns OFF.

6. After the vehicle stops, perform self-diagnosis for “ABS”.

Is DTC “C1130” detected? YES >> Replace ABS actuator and electric unit (control unit). Refer to BRC-233, "Removal and Installation".

NO >> Check pin terminals and connection of each harness connector for abnormal conditions. Repair or replace error-detected parts.

    C1121, C1123, C1125, C1127 ABS out valve system
    DTC Logic DTC DETECTION LOGIC wait at least 10 seconds before conducting the next test. >> GO TO 2. 2.CHECK DTC DETECTION With CONSULT-III 1. Turn the ignition switch OFF to ON. 2. ...

    C1140 actuator relay system
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn ignition switch OFF and wait at least ...

    Other materials:

    Line pressure test
    Inspection and Judgment INSPECTION Line Pressure Test Port Line Pressure Test Procedure 1. Inspect the amount of engine oil and replenish if necessary. 2. Drive the car for about 10 minutes to warm it up so that the CVT fluid reaches in the range of 50 to 80°C (122 to 176°F), then inspec ...

    Front door
    Exploded View 1. Front door panel 2. Grommet 3. TORX bolt 4. Door striker 5. Door pad 6. Bumper rubber 7. Door check link 8. Door hinge (lower) 9. Door hinge (upper) 10. Grommet : Do not reuse : N·m (kg-m, in-lb) : N·m (kg-m, ft-lb) : Body grease Door assembly DOOR ASSEMBLY ...

    Headlamp aiming switch
    Exploded View 1. Headlamp aiming switch 2. Instrument lower panel assembly LH : Pawl Removal and Installation REMOVAL 1. Remove instrment lower panel (LH/RH). Refer to IP-13, "Removal and Installation". 2. Remove headlamp aiming switch fixing clips, and then remove headlamp aim ...