Nissan Juke Service and Repair Manual : Interior Lighting System

Service data and specifications (SDS)
Bulb Specifications ...

Other materials:

Combination switch input circuit
Diagnosis Procedure 1.CHECK INPUT 1 - 5 CIRCUIT FOR OPEN 1. Turn ignition switch OFF. 2. Disconnect BCM and combination switch connectors. 3. Check continuity between BCM harness connector and combination switch harness connector. Does continuity exist? YES >> GO TO 2. NO >> ...

Assembly and Installation
Х Use torque wrench to tighten bolts or nuts to specification. Х When tightening nuts and bolts, as a basic rule, equally tighten in several different steps starting with the ones in center, then ones on inside and outside diagonally in this order. If the order of tightening is specified, do ...

Performance test
Inspection INSPECTION PROCEDURE 1. Connect recovery/recycling/recharging equipment (for HFC-134a) or manifold gauge. 2. Start the engine, and set to the following condition. Test condition 3. Maintain test condition until A/C system becomes stable. (Approximately 10 minutes) 4. Check t ...