Nissan Juke Service and Repair Manual : Charging System

Removal and installation
PUSH-BUTTON IGNITION SWITCH Removal and Installation REMOVAL 1. Remove the NATS antenna amp. Refer to SEC-167, "Removal and Installation". 2. Remove the push-button ignition switch. ...

Other materials:

Wiring diagram
POWER WINDOW SYSTEM LHD LHD : Wiring Diagram For connector terminal arrangements, harness layouts, and alphabets in a (option abbreviation; if not described in wiring diagram), refer to GI-12, "Connector Information/Explanation of Option Abbreviation". RHD RHD : Wiring Diagram ...

Stall test
Work Procedure INSPECTION 1. Check the engine oil level. Replenish if necessary. Refer to LU-25, "Inspection". 2. Check for leak of the CVT fluid. Refer to TM-480, "Inspection". 3. Drive for about 10 minutes to warm up the vehicle so that the CVT fluid temperature is 50 t ...

Precaution Necessary for Steering Wheel Rotation after Battery Disconne
NOTE: Х Before removing and installing any control units, first turn the ignition switch to the LOCK position, then disconnect both battery cables. Х After finishing work, confirm that all control unit connectors are connected properly, then re-connect both battery cables. Х Always use CONS ...