Nissan Juke Service and Repair Manual : Throttle valve closed position learning

Description

Throttle Valve Closed Position Learning is an operation to learn the fully closed position of the throttle valve by monitoring the throttle position sensor output signal. It must be performed each time harness connector of electric throttle control actuator or ECM is disconnected.

• Electric throttle control actuator is removed.

• Electric throttle control actuator is replaced.

• ECM is replaced.

NOTE

:
The necessary operation is different depending on the operation result of ECM data save or write. Always perform the operation according to procedures. Refer to EC-882, "Work Procedure".

Work Procedure

1.START

1. Make sure that accelerator pedal is fully released.

2. Turn ignition switch ON and wait at least 15 seconds.

Make sure that throttle valve moves during the above 15 seconds by confirming the operating sound.

3. Turn ignition switch OFF and wait at least 4 minutes.

4. Turn ignition switch ON.

>> END

    EGR volume control valve closed position learning
    Description EGR Volume Control Valve Closed Position Learning is an operation to learn the fully closed position of the EGR volume control valve by monitoring the EGR volume control valve control ...

    Service regeneration
    Description Service Regeneration is performed with CONSULT-III to reduce particulate matter in diesel particulate filter. Service Regeneration should be performed in the following cases. • EC ...

    Other materials:

    Back door opener actuator
    Diagnosis Procedure 1.CHECK BACK DOOR OPENER ACTUATOR INPUT SIGNAL 1. Turn ignition switch OFF. 2. Disconnect back door opener assembly connector. 3. Check voltage between back door opener assembly harness connector and ground. Is the inspection result normal? YES >> GO TO 3. NO > ...

    Ignition signal
    Component Function Check 1.INSPECTION START Turn ignition switch OFF, and restart engine. Does the engine start? YES-1 >> With CONSULT-III: GO TO 2. YES-2 >> Without CONSULT-III: GO TO 3. NO >> Go to EC-783, "Diagnosis Procedure". 2.IGNITION SIGNAL FUNCTION ...

    Filament
    Inspection and Repair INSPECTION 1. When measuring voltage, wrap tin foil around the top of the negative probe. Then press the foil against the wire with your finger. 2. Attach probe circuit tester (in Volt range) to middle portion of each filament. 3. If a filament is burned out, circuit ...