Nissan Juke Service and Repair Manual : Throttle valve closed position learning
Description
Throttle Valve Closed Position Learning is an operation to learn the fully closed position of the throttle valve by monitoring the throttle position sensor output signal. It must be performed each time harness connector of electric throttle control actuator or ECM is disconnected.
• Electric throttle control actuator is removed.
• Electric throttle control actuator is replaced.
• ECM is replaced.
NOTE
:
The necessary operation is different depending on the operation result of ECM
data save or write. Always
perform the operation according to procedures. Refer to EC-882, "Work
Procedure".
Work Procedure
1.START
1. Make sure that accelerator pedal is fully released.
2. Turn ignition switch ON and wait at least 15 seconds.
Make sure that throttle valve moves during the above 15 seconds by confirming the operating sound.
3. Turn ignition switch OFF and wait at least 4 minutes.
4. Turn ignition switch ON.
>> END
EGR volume control valve closed position learning
Description
EGR Volume Control Valve Closed Position Learning is an operation to learn
the fully closed position of the
EGR volume control valve by monitoring the EGR volume control valve control ...
Service regeneration
Description
Service Regeneration is performed with CONSULT-III to reduce particulate
matter in diesel particulate filter.
Service Regeneration should be performed in the following cases.
• ECM ...
Other materials:
C1110 ABS actuator and electric unit (control unit)
DTC Logic
DTC DETECTION LOGIC
DTC CONFIRMATION PROCEDURE
1.PRECONDITIONING
If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn
ignition switch OFF and
wait at least 10 seconds before conducting the next test.
>> GO TO 2.
2.CHECK DTC DETECTION
With CONSULT ...
Combination switch
Exploded View
1. Combination switch
2. Combination switch connector
Removal and Installation
REMOVAL
1. Remove steering column cover. Refer to IP-13, "Removal and
Installation".
2. Remove screws.
3. Disconnect the connector.
4. Pull up the combination switch to remove it.
I ...
Additional service when replacing ECM
Description
When replacing ECM, this procedure must be performed.
Work Procedure
1.PRECONDITIONING
• Connect a CONSULT-III
• Connect a battery charger
• Electric load switch is OFF
• Wait for the engine to cool [engine coolant temperature < 60?°C (140?°F) and air
temperature < 50?°C ( ...
