Nissan Juke Service and Repair Manual : EGR volume control valve closed position learning

Description

EGR Volume Control Valve Closed Position Learning is an operation to learn the fully closed position of the EGR volume control valve by monitoring the EGR volume control valve control position sensor output signal.

Work Procedure

1.START

1. Turn ignition switch ON.

2. Perform ???EGR ADAPTIVES??? in WORK SUPPORT mode with CONSULT-III.

3. Turn ignition switch OFF and wait at least 30 seconds.

4. Start engine and let it idle.

5. Select ???DATA MONITOR??? mode with CONSULT-III.

6. Check that the ???NEW EGR/V OFFSET??? and ???LAST EGR/V OFSET??? indication.

0.75V < NEW EGR/V OFFSET = LAST EGR/V OFSET < 1.5V

>> END

    Additional service when replacing ECM
    Description When replacing ECM, this procedure must be performed. Work Procedure 1.PRECONDITIONING • Connect a CONSULT-III • Connect a battery charger • Electric load switch is OFF • Wait for t ...

    Throttle valve closed position learning
    Description Throttle Valve Closed Position Learning is an operation to learn the fully closed position of the throttle valve by monitoring the throttle position sensor output signal. It must be pe ...

    Other materials:

    Precaution for Supplemental Restraint System (SRS) "AIR BAG" and "SEAT BELT PRE-TENSIONER"
    The Supplemental Restraint System such as “AIR BAG” and “SEAT BELT PRE-TENSIONER”, used along with a front seat belt, helps to reduce the risk or severity of injury to the driver and front passenger for certain types of collision. Information necessary to service the system safely is include ...

    Outside key antennA
    Driver side DRIVER SIDE : Removal and Installation REMOVAL Remove the driver side outside handle. Refer to DLK-339, "OUTSIDE HANDLE : Removal and Installation". INSTALLATION Install in the reverse order of removal. Passenger side PASSENGER SIDE : Removal and Installation REMOVA ...

    System initialization
    Description If any of the following operations are performed, the initialization is necessary for normal operation of power window system. • Disconnection and connection of battery cable from negative terminal. • When power window main switch replaced. • Electric power supply to power windo ...