Nissan Juke Service and Repair Manual : Additional service when replacing ECM
Description
When replacing ECM, this procedure must be performed.
Work Procedure
1.PRECONDITIONING
• Connect a CONSULT-III • Connect a battery charger • Electric load switch is OFF • Wait for the engine to cool [engine coolant temperature < 60?°C (140?°F) and air temperature < 50?°C (122?°F)].
NOTE
:
While the ECM is being programmed the cooling fan motors are triggered
automatically.
>> GO TO 2.
2.SAVE ECM DATA
Turn ignition switch ON.
Perform ???SAVE DATA FOR CPU REPLC??? in WORK SUPPORT mode with CONSULT-III.
>> GO TO 3.
3.REPLACE ECM
Replace ECM.
>> GO TO 4.
4.WRITE ECM DATA
1. Wait at least 30 seconds to turn ON the ignition switch.
2. Perform ???PRGRM REINITIALIZE??? in WORK SUPPORT mode with CONSULT-III.
3. Perform ???WRT DATA AFTR REPLC CPU??? in WORK SUPPORT mode with CONSULT-III.
4. Perform initialization of NATS system and registration of all NATS ignition key IDs.
Refer to SEC-50, "ECM : Work Procedure" (With intelligent key system), SEC-190, "ECM : Work Procedure" (Without intelligent key system).
5. Turn ignition switch OFF, wait at least 30 seconds and then turn ON.
6. Select ???DATA MONITOR??? mode in ECM with CONSULT-III.
7. Check that the ???CODE PROGRAM??? indication.
Which is displayed on CONSULT-III? YES >> GO TO 6.
NO >> GO TO 5.
5.WRITE ECM DATA
1. Perform initialization of NATS system and registration of all NATS ignition key IDs.
Refer to SEC-50, "ECM : Work Procedure" (With intelligent key system), SEC-190, "ECM : Work Procedure" (Without intelligent key system).
2. Turn ignition switch OFF, wait at least 30 seconds and then turn ON.
3. Select ???DATA MONITOR??? mode in ECM with CONSULT-III.
4. Check that the ???CODE PROGRAM??? indication.
Which is displayed on CONSULT-III? YES >> GO TO 6.
NO >> Repeat above steps.
6.PERFORM VIN REGISTRATION
1. Start engine and warm it up to normal operating temperature.
NOTE
:
The start-up phase may last up to 30 seconds.
2. Turn ignition switch OFF, wait at least 30 seconds and then turn ON.
3. Perform ???VIN REGISTRATION??? in WORK SUPPORT mode with CONSULT-III.
4. Follow the instruction of CONSULT-III display.
NOTE
:
After replace ECM, stored DTC may appear on other control unit. Clear the
malfunction memory of these
control unit.
>> END
Basic inspection
Description
NOTE:
Only consult the tests after following the diagnostic procedure chart.
Some specific checks are grouped under the ???tests??? heading and are used as
required in different dia ...
EGR volume control valve closed position learning
Description
EGR Volume Control Valve Closed Position Learning is an operation to learn
the fully closed position of the
EGR volume control valve by monitoring the EGR volume control valve control ...
Other materials:
Parking lamp circuit
Without daytime running light system
WITHOUT DAYTIME RUNNING LIGHT SYSTEM : Component Function Check
1.CHECK PARKING LAMP OPERATION
CONSULT-III ACTIVE TEST
1. Select “EXTERNAL LAMPS� of IPDM E/R active test item.
2. With operating the test items, check that the parking lamp is turned ON.
T ...
Engine control system
Engine control system : Component Parts Location
ENGINE ROOM COMPARTMENT
1. Boost control actuator
2. Turbocharger boost control solenoid
valve
3. A/F sensor 1
4. Recirculation valve
5. EVAP canister purge volume control
solenoid valve
6. Inter cooler
7. Refrigerant pressure sensor
R ...
Parking brake
WARNING
Be absolutely sure that the mechanical or electronic parking brake is completely released before driving your vehicle. Failure to do so could cause rapid brake overheating, subsequent friction brake failure, and lead to a serious accident.
Do not attempt to release th ...
