Nissan Juke Service and Repair Manual : How to read wiring diagrams

Connector Symbols
Most of connector symbols in wiring diagrams are shown from the terminal side. Х Connector symbols shown from the terminal side are enclosed by a single line and followed by the direction mark. ...

Other materials:

Main line betweeN DLC and MDU circuit
Diagnosis Procedure 1.CHECK HARNESS CONTINUITY (OPEN CIRCUIT) 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Disconnect the following harness connectors. - ECM - Multi display unit 4. Check the continuity between the data link connector and the ...

Information display (ASCD)
Component Function Check 1.CHECK INFORMATION DISPLAY 1. Start engine. 2. Press ASCD MAIN switch. 3. Drive the vehicle at more than 30 km/h (20 MPH) CAUTION: Always drive vehicle at a safe speed. 4. Press SET/ACCELERATE or SET/COAST switch. 5. Check that the readings of the speedometer show t ...

P0643 sensor power supply
DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If DTC Confirmation Procedure has been previously conducted, always turn ignition switch OFF and wait at least 10 seconds before conducting the next test. TESTING CONDITION: Before performing the following proced ...