Nissan Juke Service and Repair Manual : Headlamp ground circuit

Diagnosis Procedure

1.CHECK HEADLAMP GROUND OPEN CIRCUIT

1. Turn ignition switch OFF.

2. Disconnect headlamp connector.

3. Check continuity between headlamp harness connector and ground.

Is the inspection result normal?


Is the inspection result normal? YES >> Headlamp ground circuit is normal.

NO >> Repair or replace harness.

    Headlamp (LO) circuit
    Component Function Check 1.CHECK HEADLAMP (LO) OPERATION CONSULT-III ACTIVE TEST 1. Select “EXTERNAL LAMPS” of IPDM E/R active test item. 2. With operating the test items, check that the headlamp ...

    Daytime running light relay circuit
    Component Function Check 1.CHECK DAYTIME RUNNING LIGHT OPERATION CONSULT-III ACTIVE TEST 1. Select “EXTERNAL LAMPS” of IPDM E/R active test item. 2. With operating the test item, check that parkin ...

    Other materials:

    Cockpit
    1. Outside mirror remote control switch 2. Headlight, fog light and turn signal switch — Headlight — Turn signal light — Fog light 3. Steering wheel — Electric power steering system — Horn — Driver’s supplemental air bag 4. Wiper and washer switch 5. Shift lever — Continuously V ...

    Special Service Tool
    HFC-134a (R-134a) Service Tool and Equipment • Never mix HFC-134a (R-134a) refrigerant and/or its specified lubricant with CFC-12 (R-12) refrigerant and/ or its lubricant. • Separate and non-interchangeable service equipment must be used for handling each type of refrigerant/ lubricant. • R ...

    P2100, P2103 throttle control motor relay
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If DTC Confirmation Procedure has been previously conducted, always turn ignition switch OFF and wait at least 10 seconds before conducting the next test. TESTING CONDITION: Before performing the following proced ...