Nissan Juke Service and Repair Manual : ECM
Removal and Installation
REMOVAL
1. Remove fusible link bracket. Keep a service area.
2. Disconnect ECM harness connectors. Refer to PG-4, "Harness Connector".
3. Remove ECM mounting nuts,and then remove ECM.
INSTALLATION
Install in the reverse order of removal.
CAUTION:
Must be perform additional service when replacing ECM. Refer to EC-541, "Work
Procedure".
Fuel pump control module (FPCM)
Removal and Installation
REMOVAL
1. Remove Luggage side lower finisher LH. Refer to INT-31, "LUGGAGE SIDE
LOWER FINISHER :
Removal and Installation".
2. Disconnect fuel pump control mo ...
Other materials:
Front disc brake
Brake pad : Exploded View
MR16DDT
1. Cylinder body
2. Inner shim
3. Inner pad (with pad wear sensor)
4. Pad retainer
5. Torque member
6. Outer pad
7. Outer shim
1: Apply MOLYKOTE® AS880N or
silicone-based grease.
2: Apply MOLYKOTE® 7439 or
equivalent.
: N·m (kg-m, ft-lb)
HR1 ...
Fuel filter
Exploded View
Removal and Installation
REMOVAL (RHD)
1. Remove quick connectors in the following procedures.
• Pinch quick connector square-parts with your fingers, and pull
out the quick connector by hand.
• If quick connector and tube on vehicle are stuck, push and pull
several ti ...
Charge connector lock system
To provide enhanced security and peace of mind during public charging sessions, the Nissan Leaf is equipped with an integrated charge connector lock system. This feature allows you to securely lock your normal or trickle charge connector to the vehicle's charge port, preventing ...

