Nissan Juke Service and Repair Manual : Back-up lamp switch : Component Inspection

1.CHECK BACK-UP LAMP SWITCH

1. Disconnect position switch connector. Refer to TM-77, "Removal and Installation".

2. Check continuity between position switch terminals.


Is the inspection result normal?


Is the inspection result normal? YES >> INSPECTION END

NO >> Replace position switch. Refer to TM-77, "Removal and Installation".

    DTC/Circuit diagnosis
    POSITION SWITCH ...

    Park/neutral position (PNP) switch : Component Inspection
    1.CHECK PARK/NEUTRAL POSITION (PNP) SWITCH 1. Disconnect position switch connector. Refer to TM-77, "Removal and Installation". 2. Check continuity between position switch terminals. ...

    Other materials:

    Back door opener actuator
    Component Function Check 1.CHECK FUNCTION 1. Select “INTELLIGENT KEY” of “BCM” using CONSULT-III. 2. Select “TRUNK/BACK DOOR” in “ACTIVE TEST” mode. 3. Check that the function operates normally according to the following conditions. Is the inspection result normal? YES >> Back door o ...

    Starter motor drive control
    Starter motor drive control : System Diagram Starter motor drive control : System DescriptionINPUT/OUTPUT SIGNAL CHART INPUT/OUTPUT SIGNAL CHART *: With Intelligent Key system SYSTEM DESCRIPTION When rapid deceleration occurs during engine runs or idle speed decreases due to heavy load c ...

    For frontal collision : When SRS is activated in a collision
    CAUTION: Due to varying models and option levels, not all parts listed in the chart below apply to all vehicles. WORK PROCEDURE 1. Before performing any of the following steps, ensure that all vehicle body and structural repairs have been completed. 2. Replace the diagnosis sensor unit. ...