Nissan Juke Service and Repair Manual : Operation inspection
Work Procedure
The purpose of the operational check is to check that the individual system operates normally.
Check condition : Engine running at normal operating temperature.
1.CHECK BLOWER MOTOR
1. Operate fan control dial.
2. Check that fan speed changes. Check operation for all fan speeds.
Is the inspection result normal? YES >> GO TO 2.
NO >> GO TO 6.
2.CHECK DISCHARGE AIR
1. Operate fan control dial to set the fan speed to maximum speed.
2. Operate MODE dial to each position.
3. Check that air outlets change according to each indicated air outlet by placing a hand in front of the air outlets. Refer to VTL-5, "System Description".
Is the inspection result normal? YES >> GO TO 3.
NO >> GO TO 6.
3.CHECK INTAKE AIR
1. Operate intake lever to each position.
2. Listen to intake sound and confirm air inlets change.
Is the inspection result normal? YES >> GO TO 4.
NO >> GO TO 6.
4.CHECK DISCHARGE AIR TEMPERATURE
1. Operate temperature control dial.
2. Check that discharge air temperature changes.
Is the inspection result normal? YES >> GO TO 5.
NO >> GO TO 6.
5.CHECK TEMPERATURE INCREASE
1. Turn temperature control dial to full hot position.
2. Check that warm air blows from air outlets.
Is the inspection result normal? YES >> INSPECTION END
NO >> GO TO 6.
6.CHECK SELF-DIAGNOSIS WITH CONSULT-III
1. Perform self-diagnosis with CONSULT-III.
2. Check that any DTC is detected.
Is any DTC detected? YES >> Perform trouble diagnosis for the detected DTC.
NO >> Refer to HAC-329, "Symptom Table" and perform the appropriate diagnosis.
Diagnosis and repair workflow
Work Flow OVERALL SEQUENCE DETAILED FLOW 1.INTERVIEW FOR MALFUNCTION Interview the symptom to the customer. >> GO TO 2. 2.SYMPTOM CHECK Check the symptom from the customer's informa ...DTC/circuit diagnosis
Blower motor Diagnosis Procedure 1.CHECK SYMPTOM Check symptom (A or B). Which symptom is detected? A >> GO TO 2. B >> GO TO 7. 2.CHECK FUSE 1. Turn ignition switch OFF. 2. ...Other materials:
Diagnosis and repair work flow
Work Flow
OVERALL SEQUENCE
Reference 1··· Refer to AV-77, "Symptom Table".
DETAILED FLOW
1.CHECK SYMPTOM
Check the malfunction symptoms by performing the following items.
• Interview the customer to obtain the malfunction information (conditions and
environment when the malfu ...
System
Starting system (with intelligent key) : System Diagram
*1: M/T models
*2: CVT models
Starting system (with intelligent key) : System Description
CVT MODELS
• When selector lever is P or N, power is supplied to starter relay and
starter control relay by transmission
range switch. And BCM a ...
Wiring diagram
IPDM E/R
Wiring Diagram
For connector terminal arrangements, harness layouts, and alphabets in a
(option abbreviation; if not
described in wiring diagram), refer to GI-12, "Connector Information/Explanation
of Option Abbreviation".
...