Nissan Juke Service and Repair Manual : No engine braking
Description
CHART 11: NO ENGINE BRAKING
Diagnosis Procedure
1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT
Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure".
Is the inspection result normal? YES >> GO TO 2.
NO >> Repair or replace harness or connector.
2.CHECK WIRING HARNESS
Visually check the condition of the engine wiring harness.
Is the inspection result normal? YES >> GO TO 3.
NO >> Repair or replace harness or connector.
3.CHECK ACCELERATOR PEDAL POSITION SENSOR
Check the accelerator pedal position sensor. Refer to EC-1001, "Component Inspection".
Is the inspection result normal? YES >> GO TO 4.
NO >> Repair or replace.
4.CHECK IDLE SPEED
Check idle speed. Refer to EC-1061, "Idle Speed".
>> GO TO 5.
5.CHECK MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN
Perform the TEST 6: MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN. Refer to EC-876, "Work Procedure (TEST 6: Fuel Injectors Leak Check)".
>> GO TO 6.
6.CHECK INCORRECT FUEL INJECTION QUANTITY
Perform the TEST 7: INCORRECT FUEL INJECTION QUANTITY. Refer to EC-877, "Work Procedure (TEST 7: Fuel Injection Quantity Check)".
>> INSPECTION END
Erratic acceleration
Description
CHART 10: Erratic acceleration
Diagnosis Procedure
1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT
Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis
Procedure&q ...
Loss of power
Description
CHART 12: LOSS OF POWER
Diagnosis Procedure
1.CHECK FUEL
Check that the fuel reservoir is correctly filled and with the right fuel.
>> GO TO 2.
2.CHECK FUEL FILTER
Check t ...
Other materials:
Engine compartment
CAUTION
Never use a fuse of a higher or lower amperage rating than that specified
on the fuse box cover. This could damage the electrical system or cause a fire.
If any electrical equipment does not operate, check for an open fuse.
1. Be sure the ignition switch and the headlight switch are t ...
P0713 transmission fluid temperature sensor A
DTC Logic
DTC CONFIRMATION PROCEDURE
1.PREPARATION BEFORE WORK
If another "DTC CONFIRMATION PROCEDURE" occurs just before, turn ignition
switch OFF and wait for at
least 10 seconds, then perform the next test.
>> GO TO 2.
2.PERFORM DTC CONFIRMATION PROCEDURE
1. Start the ...
Service
• Never use electrical test equipment to check SRS circuits unless instructed
to in this Service Manual.
• Before servicing the SRS, turn ignition switch OFF, disconnect battery
negative terminal and wait 3 minutes
or more. For approximately 3 minutes after the cables are removed, it is still ...