Nissan Juke Service and Repair Manual : No engine braking

Description

CHART 11: NO ENGINE BRAKING

Diagnosis Procedure

1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT

Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure".

Is the inspection result normal? YES >> GO TO 2.

NO >> Repair or replace harness or connector.

2.CHECK WIRING HARNESS

Visually check the condition of the engine wiring harness.

Is the inspection result normal? YES >> GO TO 3.

NO >> Repair or replace harness or connector.

3.CHECK ACCELERATOR PEDAL POSITION SENSOR

Check the accelerator pedal position sensor. Refer to EC-1001, "Component Inspection".

Is the inspection result normal? YES >> GO TO 4.

NO >> Repair or replace.

4.CHECK IDLE SPEED

Check idle speed. Refer to EC-1061, "Idle Speed".

>> GO TO 5.

5.CHECK MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN

Perform the TEST 6: MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN. Refer to EC-876, "Work Procedure (TEST 6: Fuel Injectors Leak Check)".

>> GO TO 6.

6.CHECK INCORRECT FUEL INJECTION QUANTITY

Perform the TEST 7: INCORRECT FUEL INJECTION QUANTITY. Refer to EC-877, "Work Procedure (TEST 7: Fuel Injection Quantity Check)".

>> INSPECTION END

    Erratic acceleration
    Description CHART 10: Erratic acceleration Diagnosis Procedure 1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure&q ...

    Loss of power
    Description CHART 12: LOSS OF POWER Diagnosis Procedure 1.CHECK FUEL Check that the fuel reservoir is correctly filled and with the right fuel. >> GO TO 2. 2.CHECK FUEL FILTER Check t ...

    Other materials:

    Precaution Necessary for Steering Wheel Rotation after Battery Disconne
    NOTE: • Before removing and installing any control units, first turn the ignition switch to the LOCK position, then disconnect both battery cables. • After finishing work, confirm that all control unit connectors are connected properly, then re-connect both battery cables. • Always use CONS ...

    Additional service when replacing ECM
    Description When replacing ECM, this procedure must be performed. Work Procedure 1.PERFORM INITIALIZATION OF NATS SYSTEM AND REGISTRATION OF ALL NATS IGNITION KEY IDS Refer to SEC-50, "ECM : Work Procedure". >> GO TO 2. 2.PERFORM ACCELERATOR PEDAL RELEASED POSITION LEARNIN ...

    Assembly and Installation
    • Use torque wrench to tighten bolts or nuts to specification. • When tightening nuts and bolts, as a basic rule, equally tighten in several different steps starting with the ones in center, then ones on inside and outside diagonally in this order. If the order of tightening is specified, do ...