Nissan Juke Service and Repair Manual : Erratic acceleration
Description
CHART 10: Erratic acceleration
Diagnosis Procedure
1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT
Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure".
Is the inspection result normal? YES >> GO TO 2.
NO >> Repair or replace harness or connector.
2.CHECK WIRING HARNESS
Visually check the condition of the engine wiring harness.
Is the inspection result normal? YES >> GO TO 3.
NO >> Repair or replace harness or connector.
3.CHECK ACCELERATOR PEDAL POSITION SENSOR
Check the accelerator pedal position sensor. Refer to EC-1001, "Component Inspection".
Is the inspection result normal? YES >> GO TO 4.
NO >> Repair or replace.
4.CHECK CLUTCH PEDAL POSITION SWITCH
Check clutch pedal position switch.
Is the inspection result normal? YES >> GO TO 5.
NO >> Repair or replace.
5.CHECK VEHICLE SPEED SIGNAL
Check the following component.
• ???ABS actuator and electric unit (control unit)??? [Refer to BRC-24, "CONSULT-III Function". (Without ESP), BRC-131, "CONSULT-III Function". (With ESP)] • Combination meter (Refer to MWI-23, "CONSULT-III Function".) Is the inspection result normal? YES >> GO TO 6.
NO >> Repair or replace.
6.CHECK CAN COMMUNICATION
Perform trouble diagnosis on the CAN communication line using CONSULT-III. Refer to LAN-31, "CAN COMMUNICATION SYSTEM : CAN Communication Signal Chart".
Is the inspection result normal? YES >> GO TO 7.
NO >> Repair or replace harness or connector.
7.CHECK HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE)
Perform the TEST 3: HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE). Refer to EC-868, "Work Procedure [TEST 3: High Pressure Supply Pump (Pressure Control Valve) Check]".
>> GO TO 8.
8.CHECK HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE)
Perform the TEST 4: HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE). Refer to EC- 869, "Work Procedure [TEST 4: High Pressure Supply Pump (Volumetric Control Valve) Check]".
>> GO TO 9.
9.CHECK RAIL HIGH PRESSURE CONTROL CIRCUIT
Perform the TEST 5: RAIL HIGH PRESSURE CONTROL CIRCUIT CHECK. Refer to EC-871, "Work Procedure (TEST 5: Rail High Pressure Regulation Check)".
>> GO TO 10.
10.CHECK MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN
Perform the TEST 6: MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN. Refer to EC-876, "Work Procedure (TEST 6: Fuel Injectors Leak Check)".
>> GO TO 11.
11.CHECK INCORRECT FUEL INJECTION QUANTITY
Perform the TEST 7: INCORRECT FUEL INJECTION QUANTITY. Refer to EC-877, "Work Procedure (TEST 7: Fuel Injection Quantity Check)".
>> INSPECTION END
Engine bucking
Description
CHART 9: ENGINE BUCKING
Diagnosis Procedure
1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT
Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis
Procedure".
...
No engine braking
Description
CHART 11: NO ENGINE BRAKING
Diagnosis Procedure
1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT
Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis
Procedure" ...
Other materials:
Heated steering wheel switch
The Nissan Leaf heated steering wheel system is designed with intelligent efficiency, operating only when the surface temperature of the steering wheel is below approximately 68ºF (20ºC).
To activate the system, push the heated steering wheel switch while the p ...
Supplemental air bag warning labels
Supplemental front-impact air bag system warning labels
Supplemental air bag warning light
The supplemental air bag warning light, identified by the icon
located on the instrument panel, serves as a comprehensiv ...
Charge air cooler
Exploded View
1. Air inlet tube assembly
2. Air inlet tube bracket
3. Clamp
4. Air inlet hose
5. Gasket
6. Turbocharger
7. Mounting rubber
8. Charge air cooler
9. Air inlet tube assembly
10. Air inlet tube bracket
11. Air inlet hose
12. Air inlet tube assembly
13.Turbochager b ...
