Nissan Juke Service and Repair Manual : Impossible to shut off engine

Description

CHART 4: IMPOSSIBLE TO SHUT OFF ENGINE

Diagnosis Procedure

1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT

Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure".

Is the inspection result normal? YES >> GO TO 2.

NO >> Repair or replace harness or connector.

2.CHECK WIRING HARNESS

Visually check the condition of the engine wiring harness.

Is the inspection result normal? YES >> INSPECTION END

NO >> Repair or replace harness or connector.

    Starting difficult with cold engine
    Description CHART 3: STARTING DIFFICULT WITH COLD ENGINE Diagnosis Procedure 1.CHECK ENGINE OIL LEVEL Is the engine oil level correct? Yes or No Yes >> GO TO 2. No >> Top up the o ...

    Engine idle speed too high
    Description CHART 5: ENGINE IDLE SPEED TOO HIGH Diagnosis Procedure 1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Proced ...

    Other materials:

    Engine emits blue smoke
    Description CHART 19: ENGINE EMITS BLUE SMOKE Diagnosis Procedure 1.CHECK ENGINE OIL Check the grade of engine oil. Refer to LU-33, "Inspection". Is the inspection result normal? YES >> GO TO 2. NO >> Replace engine oil. Refer to LU-34, "Refilling". 2.CH ...

    P0717 input speed sensor A
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE CAUTION: Always drive vehicle at a safe speed. NOTE: If “DTC CONFIRMATION PROCEDURE” has been previously performed, always turn ignition switch OFF and wait at least 10 seconds before performing the next test. After the repair, p ...

    Park/neutral position (PNP) switch : Component Inspection
    1.CHECK PARK/NEUTRAL POSITION (PNP) SWITCH 1. Disconnect position switch connector. Refer to TM-77, "Removal and Installation". 2. Check continuity between position switch terminals. Is the inspection result normal? YES >> INSPECTION END NO >> Replace position switch ...