Nissan Juke Service and Repair Manual : CVT shift lock system

Wiring diagram

connector terminal arrangements, harness layouts, and alphabets in a described in wiring diagram), refer to GI-12, "Connector Information/Explanation(option abbreviation; if not
described in wiring diagram), refer to GI-12, "Connector Information/Explanation of Option Abbreviation".

Basic inspection


    CVT control system
    Wiring diagram For connector terminal arrangements, harness layouts, and alphabets in a (option abbreviation; if not described in wiring diagram), refer to GI-12, "Connector Information/Expla ...

    Other materials:

    Take away warning does not operate
    Diagnosis Procedure 1.CHECK DTC WITH BCM AND COMBINATION METER Check that DTC is not detected with BCM and combination meter. Is the inspection result normal? YES >> GO TO 2. NO-1 >> Refer to BCS-67, "DTC Index". (BCM) NO-2 >> Refer to MWI-36, "DTC Index&qu ...

    Shift P warning lamp
    Component Function Check 1.CHECK FUNCTION 1. Select “INTELLIGENT KEY” of “BCM” using CONSULT-III. 2. Select “LCD” in “ACTIVE TEST” mode. 3. Check that the function operates normally according to the following conditions. Is the inspection result normal? YES >> Shift P warning lamp is ...

    P0097, P0098 IAT sensor 2
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If DTC Confirmation Procedure has been previously conducted, always perform the following procedure before conducting the next test. 1. Turn ignition switch OFF and wait at least 10 seconds. 2. Turn ignition swit ...