Nissan Juke Service and Repair Manual : C1121, C1123, C1125, C1127 ABS out valve system

DTC Logic

DTC DETECTION LOGIC

DTC CONFIRMATION PROCEDURE


DTC CONFIRMATION PROCEDURE

1.PRECONDITIONING

If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn ignition switch OFF and wait at least 10 seconds before conducting the next test.

>> GO TO 2.

2.CHECK DTC DETECTION

1. Turn the ignition switch OFF to ON.With CONSULT-III


1. Turn the ignition switch OFF to ON.

2. Perform self-diagnosis for “ABS”.

Is DTC “C1121”, “C1123”, “C1125” or “C1127” detected? YES >> Proceed to BRC-58, "Diagnosis Procedure".

NO >> INSPECTION END

Diagnosis Procedure

1.CHECK CONNECTOR

1. Turn the ignition switch OFF.

2. Check ABS actuator and electric unit (control unit) harness connector for disconnection or looseness.

Is the inspection result normal? YES >> GO TO 3.

NO >> Repair or replace error-detected parts, securely lock the connector, and GO TO 2.

2.PERFORM SELF-DIAGNOSIS

Perform self-diagnosis for “ABS” again.

Is DTC “C1121”, “C1123”, “C1125” or “C1127” detected? YES >> GO TO 3.

NO >> INSPECTION END

3.CHECK ABS OUT VALVE POWER SUPPLY

1. Turn the ignition switch OFF.

2. Disconnect ABS actuator and electric unit (control unit) harness connector.

3. Check voltage between ABS actuator and electric unit (control unit) harness connector and ground.

4. Turn the ignition switch ON.


4. Turn the ignition switch ON.

CAUTION:
Never start engine.

5. Check voltage between ABS actuator and electric unit (control unit) harness connector and ground.

Is the inspection result normal?


Is the inspection result normal? YES >> GO TO 5.

NO >> GO TO 4.

4.CHECK ABS OUT VALVE POWER SUPPLY CIRCUIT

1. Turn the ignition switch OFF.

2. Check 40 A fusible link (F).

3. Check continuity and short circuit between ABS actuator and electric unit (control unit) harness connector terminal (2) and 40 A fusible link (F).

Is the inspection result normal? YES >> Perform trouble diagnosis for battery power supply. Refer to PG-10, "Wiring Diagram - BATTERY POWER SUPPLY -".

NO >> Repair or replace error-detected parts.

5.CHECK ABS OUT VALVE GROUND CIRCUIT

1. Turn the ignition switch OFF.

2. Check continuity between ABS actuator and electric unit (control unit) harness connector and the ground.

Is the inspection result normal?


Is the inspection result normal? YES >> GO TO 6.

NO >> Repair or replace error-detected parts.

6.CHECK TERMINAL

Check ABS actuator and electric unit (control unit) pin terminals for damage or loose connection with harness connector.

Is the inspection result normal? YES >> Replace ABS actuator and electric unit (control unit). Refer to BRC-90, "Removal and Installation".

NO >> Repair or replace error-detected parts.

    C1120, C1122, C1124, C1126 ABS in valve system
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn ignition switch OFF and wait at least 10 ...

    C1140 actuator relay system
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn ignition switch OFF and wait at least 10 ...

    Other materials:

    P0037, P0038 HO2S2 heater
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If DTC Confirmation Procedure has been previously conducted, always perform the following procedure before conducting the next test. 1. Turn ignition switch OFF and wait at least 10 seconds. 2. Turn ignition switc ...

    B1113, B1114 satellite sensor RH
    DTC Logic DTC DETECTION LOGIC 1.CHECK SELF-DIAG RESULT With CONSULT-III 1. Turn ignition switch ON. 2. Perform “Self Diagnostic Result” mode of “AIR BAG” using CONSULT-III. Without CONSULT-III 1. Turn ignition switch ON. 2. Check the air bag warning lamp status. Refer to SRC-12, "On ...

    ASCD main switch
    Component Function Check 1.CHECK ASCD MAIN SWITCH FUNCTION 1. Turn ignition switch ON. 2. Check the voltage between ECM harness connector terminals under the following conditions. Is the inspection result normal? YES >> INSPECTION END NO >> Go to EC-1009, "Diagnosis Proced ...