Nissan Juke Service and Repair Manual : Precaution Necessary for Steering Wheel Rotation after Battery Discon

NOTE

:
• Before removing and installing any control units, first turn the ignition switch to the LOCK position, then disconnect both battery cables.

• After finishing work, confirm that all control unit connectors are connected properly, then re-connect both battery cables.

• Always use CONSULT-III to perform self-diagnosis as a part of each function inspection after finishing work.

If a DTC is detected, perform trouble diagnosis according to self-diagnosis results.

For vehicle with steering lock unit, if the battery is disconnected or discharged, the steering wheel will lock and cannot be turned.

If turning the steering wheel is required with the battery disconnected or discharged, follow the operation procedure below before starting the repair operation.

OPERATION PROCEDURE

1. Connect both battery cables.

NOTE

:
Supply power using jumper cables if battery is discharged.

2. Turn the ignition switch to ACC position. (At this time, the steering lock will be released.)
3. Disconnect both battery cables. The steering lock will remain released with both battery cables disconnected and the steering wheel can be turned.

4. Perform the necessary repair operation.

5. When the repair work is completed, re-connect both battery cables. With the brake pedal released, turn the ignition switch from ACC position to ON position, then to LOCK position. (The steering wheel will lock when the ignition switch is turned to LOCK position.) 6. Perform self-diagnosis check of all control units using CONSULT-III.

    Precaution for Supplemental Restraint System (SRS) "AIR BAG" and "SEAT BELT PRE-TENSIONER"
    The Supplemental Restraint System such as “AIR BAG” and “SEAT BELT PRE-TENSIONER”, used along with a front seat belt, helps to reduce the risk or severity of injury to the driver and front passen ...

    Precaution for Procedure without Cowl Top Cover
    When performing the procedure after removing cowl top cover, cover the lower end of windshield with urethane, etc. ...

    Other materials:

    Operation inspection
    Work Procedure The purpose of the operational check is to check that the individual system operates normally. Check condition : Engine running at normal operating temperature. 1.CHECK MEMORY FUNCTION 1. Set temperature to 30°C by operating the temperature control dial. 2. Press OFF switch. 3 ...

    Drive belt
    Exploded View 1. Alternator 2. Drive belt auto-tensioner 3. Crankshaft pulley 4. A/C compressor 5. Water pump 6. Drive belt A. Possible use range B. Range when new drive belt is installed C. Indicator Checking WARNING: Perform this step when engine is stopped. • Check that th ...

    Door request switch
    Component Function Check 1.CHECK FUNCTION 1. Select “INTELLIGENT KEY” of “BCM” using CONSULT-III. 2. Select “REQ SW-DR”, “REQ SW-AS” in “DATA MONITOR” mode. 3. Check that the function operates normally according to the following conditions. Is the inspection result normal? YES >> Fro ...