Nissan Juke Service and Repair Manual : Precaution for Disposal

• Before disposing of air bag module, pop-up roll bar and seat belt pre-tensioner, or vehicles equipped with such systems, deploy the systems. If such systems have already been deployed due to an accident, dispose of them as indicated in Disposing of Air Bag Module, Pop-up Roll Bar and Seat Belt Pre-tensioner.

• When deploying the air bag module, pop-up roll bar and seat belt pre-tensioner, always use the Special Service Tool; Deployment tool (SST: KV99106400).

• When deploying the air bag module, pop-up roll bar and seat belt pre-tensioner, stand at least 5.0 m (16.4 ft.) away from the deployment component.

• When deploying air bag module, pop-up roll bar and seat belt pre-tensioner, a fairly loud noise is made, followed by smoke being released. The smoke is not poisonous, however, be careful not to inhale smoke since it irritates the throat and can cause choking.

• Always activate one air bag module at a time.

• Due to heat, leave air bag module unattended for more than 30 minutes after deployment. Also leave pop-up roll bar and seat belt pre-tensioner unattended for more than 10 minutes after deployment.

• Wear gloves when handling a deployed air bag module, pop-up roll bar and seat belt pre-tensioner.

• Never apply water to the deployed air bag module, pop-up roll bar and seat belt pre-tensioner.

• Wash your hands after work is completed.

• Place the vehicle outdoors with an open space of at least 6.0 m (19.7 ft) on all sides when deploying air bag module, pop-up roll bar and seat belt pre-tensioner while mounted in vehicle.

• Use a volt meter to make sure the vehicle battery is fully charged.

• Never dispose of the air bag module, pop-up roll bar and seat belt pre-tensioner that does not deploy.

    Precaution Necessary for Steering Wheel Rotation after Battery Disconnect
    NOTE: • Before removing and installing any control units, first turn the ignition switch to the LOCK position, then disconnect both battery cables. • After finishing work, confirm that all contro ...

    Service
    • Never use electrical test equipment to check SRS circuits unless instructed to in this Service Manual. • Before servicing the SRS, turn ignition switch OFF, disconnect battery negative terminal ...

    Other materials:

    P1612 chain of ECM-IMMU
    DTC Logic DTC DETECTION LOGIC NOTE: • If DTC P1612 is displayed with DTC U1000 (for BCM), first perform the trouble diagnosis for DTC U1000. Refer to BCS-153, "DTC Logic". • If DTC P1612 is displayed with DTC U1010 (for BCM), first perform the trouble diagnosis for DTC U1010. ...

    Additional service when replacing ECM
    Description When replacing ECM, this procedure must be performed. Work Procedure 1.PERFORM INITIALIZATION OF NATS SYSTEM AND REGISTRATION OF ALL NATS IGNITION KEY IDS Refer to SEC-50, "ECM : Work Procedure". >> GO TO 2. 2.PERFORM ACCELERATOR PEDAL RELEASED POSITION LEARNIN ...

    Injection tube and fuel injector
    Exploded View 1. Spill hose 2. Injection tube 3. Fuel injector 4. Heat protection washer 5. Fuel injector bracket 6. Fuel injector bracket spacer 7. Fuel rail stud bolt 8. Fuel rail 9. High pressure protection cover (lower) 10. Injection tube 11. High pressure supply pump 12. H ...