Nissan Juke Service and Repair Manual : LAN system can fundamental
Combination switch
Exploded View 1. Combination switch 2. Combination switch connector Removal and Installation REMOVAL 1. Remove steering column cover. Refer to IP-13, "Removal and Installation". 2 ...Precaution
Precautions for Trouble Diagnosis CAUTION: • Never apply 7.0 V or more to the measurement terminal. • Use a tester with open terminal voltage of 7.0 V or less. • Turn the ignition switch OFF and d ...Other materials:
Diagnosis and repair workflow
Work Flow
OVERALL SEQUENCE
• Malfunctions are declared as either present or stored (depending on whether
they appeared in a certain context
and have disappeared since, or whether they remain present but have not been
diagnosed within the
current context).
• The present or stored status of ...
A/C auto AMP.
Reference Value
CONSULT-III DATA MONITOR REFERENCE VALUES
*: “DUTY” is displayed, but voltage is indicated. Or unit is not displayed
but unit is (V).
TERMINAL LAYOUT
PHYSICAL VALUES
*: With K9K
Fail-safe
FAIL-SAFE FUNCTION
If a communication error exists between the A/C auto amp. a ...
C1109 power and ground system
DTC Logic
DTC DETECTION LOGIC
DTC CONFIRMATION PROCEDURE
1.PRECONDITIONING
If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn
ignition switch OFF and
wait at least 10 seconds before conducting the next test.
>> GO TO 2.
2.CHECK DTC DETECTION
With CONSULT ...