Nissan Juke Service and Repair Manual : Excessive consumption

Description

CHART 15:EXCESSIVE CONSUMPTION

Diagnosis Procedure

1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT

Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure".

Is the inspection result normal? YES >> GO TO 2.

NO >> Repair or replace harness or connector.

2.CHECK WIRING HARNESS

Visually check the condition of the engine wiring harness.

Is the inspection result normal? YES >> GO TO 3.

NO >> Repair or replace harness or connector.

3.CHECK AIR INTAKE SYSTEM

Check air intake system. Refer to EM-280, "Removal and Installation".

Is the inspection result normal? YES >> GO TO 4.

NO >> Repair or replace air intake system.

4.CHECK ELECTRIC THROTTLE CONTROL ACTUATOR

Check electric throttle control actuator. Refer to EC-909, "Diagnosis Procedure".

Is the inspection result normal? YES >> GO TO 5.

NO >> Repair or replace.

5.CHECK MASS AIR FLOW SENSOR

Check mass air flow sensor. Refer to EC-902, "Component Inspection".

Is the inspection result normal? YES >> GO TO 6.

NO >> Repair or replace.

6.CHECK TURBOCHARGER

Check that the turbocharger is working properly. Refer to EC-1003, "Diagnosis Procedure".

Is the turbocharger correct? Yes >> GO TO 7.

No >> Repair or replace.

7.CHECK ENGINE COOLANT TEMPERATURE SENSOR

Check engine coolant temperature sensor. Refer to EC-908, "Component Inspection".

Is the inspection result normal? Yes >> GO TO 8.

No >> Repair or replace.

8.CHECK LOW PRESSURE CIRCUIT

Perform the TEST 1: LOW PRESSURE CIRCUIT CHECK. Refer to EC-867, "Work Procedure (TEST 1: Low Pressure Fuel Supply System Check)".

>> GO TO 9.

9.CHECK INTERNAL FUEL TRANSFER PUMP

Perform the TEST 2: INTERNAL FUEL TRANSFER PUMP CHECK. Refer to EC-868, "Work Procedure (TEST 2: Internal Fuel Transfer Pump Check)".

>> GO TO 10.

10.CHECK HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE)

Perform the TEST 3: HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE). Refer to EC-868, "Work Procedure [TEST 3: High Pressure Supply Pump (Pressure Control Valve) Check]".

>> GO TO 11.

11.CHECK HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE)

Perform the TEST 4: HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE). Refer to EC- 869, "Work Procedure [TEST 4: High Pressure Supply Pump (Volumetric Control Valve) Check]".

>> GO TO 12.

12.CHECK RAIL HIGH PRESSURE CONTROL CIRCUIT

Perform the TEST 5: RAIL HIGH PRESSURE CONTROL CIRCUIT CHECK. Refer to EC-871, "Work Procedure (TEST 5: Rail High Pressure Regulation Check)".

>> GO TO 13.

13.CHECK MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN

Perform the TEST 6: MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN. Refer to EC-876, "Work Procedure (TEST 6: Fuel Injectors Leak Check)".

>> GO TO 14.

14.CHECK INCORRECT FUEL INJECTION QUANTITY

Perform the TEST 7: INCORRECT FUEL INJECTION QUANTITY. Refer to EC-877, "Work Procedure (TEST 7: Fuel Injection Quantity Check)".

>> INSPECTION END

    Overspeed at idle speed or on releasing brake
    Description CHART 14: OVERSPEED AT IDLE SPEED OR ON RELEASING BRAKE Diagnosis Procedure 1.CHECK ENGINE OIL Check the grade of engine oil. Refer to LU-33, "Inspection". Is the inspecti ...

    Engine knock
    Description CHART 16: ENGINE KNOCK Diagnosis Procedure 1.CHECK ENGINE OIL Check the grade of engine oil. Refer to LU-33, "Inspection". Is the inspection result normal? YES >> G ...

    Other materials:

    P183C decel G sensor
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn ignition switch OFF and wait at least 10 seconds before conducting the next test. >> GO TO 2. 2.DTC REPRODUCTION PROCEDURE With ...

    Additional service when replacing control unit
    Description BEFORE REPLACEMENT When replacing BCM, save or print current vehicle specification with CONSULT-III configuration before replacement. NOTE: If “READ CONFIGURATION” can not be used, use the “WRITE CONFIGURATION - Manual selection” after replacing BCM. AFTER REPLACEMENT CAU ...

    Parking brake switch signal circuit
    Diagnosis Procedure 1.CHECK COMBINATION METER INPUT SIGNAL 1. Turn ignition switch ON. 2. Check the voltage between combination meter harness connector and ground. Is the inspection result normal? YES >> INSPECTION END NO >> GO TO 2. 2.CHECK PARKING BRAKE SWITCH SIGNAL CIRCUIT ...