Nissan Juke Service and Repair Manual : Engine knock
Description
CHART 16: ENGINE KNOCK
Diagnosis Procedure
1.CHECK ENGINE OIL
Check the grade of engine oil. Refer to LU-33, "Inspection".
Is the inspection result normal? YES >> GO TO 2.
NO >> Replace engine oil. Refer to LU-34, "Refilling".
2.CHECK ENGINE OIL LEVEL
Is the engine oil level correct? Yes or No Yes >> GO TO 3.
No >> Top up the oil.
3.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT
Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure".
Is the inspection result normal? YES >> GO TO 4.
NO >> Repair or replace harness or connector.
4.CHECK WIRING HARNESS
Visually check the condition of the engine wiring harness.
Is the inspection result normal? YES >> GO TO 5.
NO >> Repair or replace harness or connector.
5.CHECK AIR INTAKE SYSTEM
Check air intake system. Refer to EM-280, "Removal and Installation".
Is the inspection result normal? YES >> GO TO 6.
NO >> Repair or replace air intake system.
6.CHECK ELECTRIC THROTTLE CONTROL ACTUATOR
Check electric throttle control actuator. Refer to EC-909, "Diagnosis Procedure".
Is the inspection result normal? YES >> GO TO 7.
NO >> Repair or replace.
7.CHECK MASS AIR FLOW SENSOR
Check mass air flow sensor. Refer to EC-902, "Component Inspection".
Is the inspection result normal? YES >> GO TO 8.
NO >> Repair or replace.
8.CHECK CATALYTIC CONVERTER
Is the catalytic converter clogged or deteriorated? Is the inspection result normal? YES >> GO TO 9.
NO >> Repair or replace.
9.CHECK HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE)
Perform the TEST 3: HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE). Refer to EC-868, "Work Procedure [TEST 3: High Pressure Supply Pump (Pressure Control Valve) Check]".
>> GO TO 10.
10.CHECK HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE)
Perform the TEST 4: HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE). Refer to EC- 869, "Work Procedure [TEST 4: High Pressure Supply Pump (Volumetric Control Valve) Check]".
>> GO TO 11.
11.CHECK RAIL HIGH PRESSURE CONTROL CIRCUIT
Perform the TEST 5: RAIL HIGH PRESSURE CONTROL CIRCUIT CHECK. Refer to EC-871, "Work Procedure (TEST 5: Rail High Pressure Regulation Check)".
>> GO TO 12.
12.CHECK MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN
Perform the TEST 6: MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN. Refer to EC-876, "Work Procedure (TEST 6: Fuel Injectors Leak Check)".
>> GO TO 13.
13.CHECK INCORRECT FUEL INJECTION QUANTITY
Perform the TEST 7: INCORRECT FUEL INJECTION QUANTITY. Refer to EC-877, "Work Procedure (TEST 7: Fuel Injection Quantity Check)".
>> INSPECTION END
Excessive consumption
Description
CHART 15:EXCESSIVE CONSUMPTION
Diagnosis Procedure
1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT
Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis
Procedure&q ...
Engine overheating
Description
CHART 17: ENGINE OVERHEATING
Diagnosis Procedure
1.CHECK COOLING SYSTEM
Check the cooling system. Refer to CO-60, "Troubleshooting Chart".
Is the inspection result normal? ...
Other materials:
Both side front fog lamps are not turned on
Description
The front fog lamps are not turned ON in any condition.
Diagnosis Procedure
1.CHECK FUSE
Check that the following fuse is fusing.
Is the inspection result normal?
YES >> GO TO 2.
NO >> Repair the applicable circuit. And then replace the fuse.
2.COMBINATION SWITC ...
P0713 transmission fluid temperature sensor A
DTC Logic
DTC CONFIRMATION PROCEDURE
1.PREPARATION BEFORE WORK
If another "DTC CONFIRMATION PROCEDURE" occurs just before, turn ignition
switch OFF and wait for at
least 10 seconds, then perform the next test.
>> GO TO 2.
2.PERFORM DTC CONFIRMATION PROCEDURE
1. Start the ...
Normal operating condition
Description
FUEL CUT CONTROL (AT NO LOAD AND HIGH ENGINE SPEED)
If the engine speed is above 1,800 rpm under no load (for example, the
selector lever position is neutral and
engine speed is over 1,800 rpm) fuel will be cut off after some time. The exact
time when the fuel is cut off varies
b ...