Nissan Juke Service and Repair Manual : Engine knock

Description

CHART 16: ENGINE KNOCK

Diagnosis Procedure

1.CHECK ENGINE OIL

Check the grade of engine oil. Refer to LU-33, "Inspection".

Is the inspection result normal? YES >> GO TO 2.

NO >> Replace engine oil. Refer to LU-34, "Refilling".

2.CHECK ENGINE OIL LEVEL

Is the engine oil level correct? Yes or No Yes >> GO TO 3.

No >> Top up the oil.

3.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT

Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure".

Is the inspection result normal? YES >> GO TO 4.

NO >> Repair or replace harness or connector.

4.CHECK WIRING HARNESS

Visually check the condition of the engine wiring harness.

Is the inspection result normal? YES >> GO TO 5.

NO >> Repair or replace harness or connector.

5.CHECK AIR INTAKE SYSTEM

Check air intake system. Refer to EM-280, "Removal and Installation".

Is the inspection result normal? YES >> GO TO 6.

NO >> Repair or replace air intake system.

6.CHECK ELECTRIC THROTTLE CONTROL ACTUATOR

Check electric throttle control actuator. Refer to EC-909, "Diagnosis Procedure".

Is the inspection result normal? YES >> GO TO 7.

NO >> Repair or replace.

7.CHECK MASS AIR FLOW SENSOR

Check mass air flow sensor. Refer to EC-902, "Component Inspection".

Is the inspection result normal? YES >> GO TO 8.

NO >> Repair or replace.

8.CHECK CATALYTIC CONVERTER

Is the catalytic converter clogged or deteriorated? Is the inspection result normal? YES >> GO TO 9.

NO >> Repair or replace.

9.CHECK HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE)

Perform the TEST 3: HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE). Refer to EC-868, "Work Procedure [TEST 3: High Pressure Supply Pump (Pressure Control Valve) Check]".

>> GO TO 10.

10.CHECK HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE)

Perform the TEST 4: HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE). Refer to EC- 869, "Work Procedure [TEST 4: High Pressure Supply Pump (Volumetric Control Valve) Check]".

>> GO TO 11.

11.CHECK RAIL HIGH PRESSURE CONTROL CIRCUIT

Perform the TEST 5: RAIL HIGH PRESSURE CONTROL CIRCUIT CHECK. Refer to EC-871, "Work Procedure (TEST 5: Rail High Pressure Regulation Check)".

>> GO TO 12.

12.CHECK MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN

Perform the TEST 6: MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN. Refer to EC-876, "Work Procedure (TEST 6: Fuel Injectors Leak Check)".

>> GO TO 13.

13.CHECK INCORRECT FUEL INJECTION QUANTITY

Perform the TEST 7: INCORRECT FUEL INJECTION QUANTITY. Refer to EC-877, "Work Procedure (TEST 7: Fuel Injection Quantity Check)".

>> INSPECTION END

    Excessive consumption
    Description CHART 15:EXCESSIVE CONSUMPTION Diagnosis Procedure 1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure&q ...

    Engine overheating
    Description CHART 17: ENGINE OVERHEATING Diagnosis Procedure 1.CHECK COOLING SYSTEM Check the cooling system. Refer to CO-60, "Troubleshooting Chart". Is the inspection result normal? ...

    Other materials:

    P1586 G sensor
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE CAUTION: Be careful of the driving speed. 1.PREPARATION BEFORE WORK If another "DTC CONFIRMATION PROCEDURE" occurs just before, turn ignition switch OFF and wait for at least 10 seconds, then perform the next test. > ...

    ECU diagnosis information
    ECM Reference Value TERMINAL LAYOUT PHYSICAL VALUES NOTE: • ECM is located in the engine room left side near battery. • When disconnecting ECM harness connector (1), loosen (B) it with levers as far as they will go as shown in the figure. 2 : ECM A : Fasten • Pulse signal is measured by ...

    Diagnosis and repair workflow
    Work Flow OVERALL SEQUENCE DETAILED FLOW 1.INTERVIEW FOR MALFUNCTION Interview the symptom to the customer. >> GO TO 2. 2.SYMPTOM CHECK Check the symptom from the customer's information. >> GO TO 3. 3.BASIC INSPECTION Check the operation of each part. Check that any s ...