Nissan Juke Service and Repair Manual : Emission control not satisfactory

Description

CHART 22: EMISSION CONTROL NOT SATISFACTORY

Diagnosis Procedure

1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT

Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure".

Is the inspection result normal? YES >> GO TO 2.

NO >> Repair or replace harness or connector.

2.CHECK WIRING HARNESS

Visually check the condition of the engine wiring harness.

Is the inspection result normal? YES >> GO TO 3.

NO >> Repair or replace harness or connector.

3.CHECK AIR INTAKE SYSTEM

Check air intake system. Refer to EM-280, "Removal and Installation".

Is the inspection result normal? YES >> GO TO 4.

NO >> Repair or replace air intake system.

4.CHECK ELECTRIC THROTTLE CONTROL ACTUATOR

Check electric throttle control actuator. Refer to EC-909, "Diagnosis Procedure".

Is the inspection result normal? YES >> GO TO 5.

NO >> Repair or replace.

5.CHECK MASS AIR FLOW SENSOR

Check mass air flow sensor. Refer to EC-902, "Component Inspection".

Is the inspection result normal? YES >> GO TO 6.

NO >> Repair or replace.

6.CHECK TURBOCHARGER

Check that the turbocharger is working properly. Refer to EC-1003, "Diagnosis Procedure".

Is the turbocharger correct? Yes >> GO TO 7.

No >> Repair or replace.

7.CHECK EGR SYSTEM

Check EGR system. Refer to EC-954, "Diagnosis Procedure".

Is the inspection result normal? YES >> GO TO 8.

NO >> Repair or replace.

8.CHECK HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE)

Perform the TEST 3: HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE). Refer to EC-868, "Work Procedure [TEST 3: High Pressure Supply Pump (Pressure Control Valve) Check]".

>> GO TO 9.

9.CHECK HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE)

Perform the TEST 4: HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE). Refer to EC- 869, "Work Procedure [TEST 4: High Pressure Supply Pump (Volumetric Control Valve) Check]".

>> GO TO 10.

10.CHECK RAIL HIGH PRESSURE CONTROL CIRCUIT

Perform the TEST 5: RAIL HIGH PRESSURE CONTROL CIRCUIT CHECK. Refer to EC-871, "Work Procedure (TEST 5: Rail High Pressure Regulation Check)".

>> GO TO 11.

11.CHECK MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN

Perform the TEST 6: MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN. Refer to EC-876, "Work Procedure (TEST 6: Fuel Injectors Leak Check)".

>> GO TO 12.

12.CHECK INCORRECT FUEL INJECTION QUANTITY

Perform the TEST 7: INCORRECT FUEL INJECTION QUANTITY. Refer to EC-877, "Work Procedure (TEST 7: Fuel Injection Quantity Check)".

>> INSPECTION END

    Engine emits white smoke (especially when starting)
    Description CHART 21: ENGINE EMITS WHITE SMOKE (ESPECIALLY WHEN STARTING) Diagnosis Procedure 1.CHECK FUEL Check that the fuel reservoir is correctly filled and with the right fuel. >> GO ...

    Service data and specifications (SDS)
    Idle Speed *: Under the following conditions A/C switch: OFF Electric load: OFF (Lights, glow plug, heater fan & rear window defogger) Steering wheel: Kept in straight-ahead position ...

    Other materials:

    G sensor calibration
    Description TCM stores calibration data (inherent characteristic value) of G sensor to provide accurate control. Therefore, it is required to perform calibration of G sensor after the following work is performed. Removal/installation or replacement of G sensor Replacement of TCM Proce ...

    Basic inspection
    Description NOTE: Only consult the tests after following the diagnostic procedure chart. Some specific checks are grouped under the ???tests??? heading and are used as required in different diagnostic charts. Work Procedure (TEST 1: Low Pressure Fuel Supply System Check) NOTE: CAUSE ...

    ECM branch line circuit
    Diagnosis Procedure 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the terminals and connectors of the ECM for damage, bend and loose connection (unit side and connector side). Is the inspection result normal? YES &g ...