Nissan Juke Service and Repair Manual : Instrument Panel

Other materials:

HR16DE : Inspection and Adjust
INSPECTION Magnetic Switch Check Before starting to check, disconnect the battery cable from the negative terminal. Disconnect M terminal of starter motor. 1. Continuity test [between S terminal (A) and switch body] B : B terminal C : M terminal Replace magnetic switch if co ...

Precaution Necessary for Steering Wheel Rotation after Battery Disconnect
NOTE: Before removing and installing any control units, first turn the ignition switch to the LOCK position, then disconnect both battery cables. After finishing work, confirm that all control unit connectors are connected properly, then re-connect both battery cables. Always use CONS ...

Precaution Necessary for Steering Wheel Rotation after Battery Disconnect
NOTE: Before removing and installing any control units, first turn the ignition switch to the LOCK position, then disconnect both battery cables. After finishing work, confirm that all control unit connectors are connected properly, then re-connect both battery cables. Always use CONS ...