Nissan Juke Service and Repair Manual : G sensor calibration

Description

TCM stores calibration data (inherent characteristic value) of G sensor to provide accurate control. Therefore, it is required to perform calibration of G sensor after the following work is performed.

• Removal/installation or replacement of G sensor • Replacement of TCM

Procedure

1.PREPARATION BEFORE CALIBRATION PROCEDURE

1. Park the vehicle on a level surface.

2. Adjust air pressure of all tires to the specified pressure. WT-9, "Tire Air Pressure".

>> GO TO 2.

2.PERFORM CALIBRATION

1. Turn ignition switch ON.With CONSULT-III


1. Turn ignition switch ON.

CAUTION:
Never start engine.

2. Select “Work Support” in “TRANSMISSION”.

3. Select “G SENSOR CALIBRATION”.

4. Touch “Start”.

CAUTION:
Never swing the vehicle during “G sensor calibration”.

Is “COMPLETED” displayed? YES >> GO TO 3.

NO >> Perform steps 1 and 2 again.

3.PERFORM THE SELF-DIAGNOSIS

1. Turn ignition switch OFF and wait for 10 seconds.With CONSULT-III


1. Turn ignition switch OFF and wait for 10 seconds.

2. Turn ignition switch ON.

3. Select “Self Diagnostic Results” in “TRANSMISSION”.

Is “P1586” or “P1588” detected? YES >> Go to TM-366, "DTC Index".

NO >> Calibration end

    Additional service when replacing transaxle assembly
    Description Perform the following work after the transaxle assembly is replaced. Erasing the calibration data • The TCM acquires calibration data (individual characteristic value) of each solen ...

    CVT fluid
    Replacement CVT fluid : Refer to TM-512, "General Specification". Fluid capacity : Refer to TM-512, "General Specificatio CAUTION: • Use only Genuine NISSAN CVT Fluid NS-2. Using tr ...

    Other materials:

    Additional service when replacing ECM
    Description When replacing ECM, this procedure must be performed. Work Procedure 1.PERFORM INITIALIZATION OF NATS SYSTEM AND REGISTRATION OF ALL NATS IGNITION KEY IDS Refer to SEC-50, "BCM : Special Repair Requirement" (With intelligent key system), SEC-190, "BCM : Work Proce ...

    BCM
    LHD LHD : Wiring Diagram For connector terminal arrangements, harness layouts, and alphabets in a (option abbreviation; if not described in wiring diagram), refer to GI-12, "Connector Information/Explanation of Option Abbreviation". ...

    Battery inspection
    How to Handle Battery CAUTION: • If it becomes necessary to start the engine with a booster battery and jumper cables, use a 12-volt booster battery. • After connecting battery cables, ensure that they are tightly clamped to battery terminals for good contact. • Never add distilled water t ...