Nissan Juke Service and Repair Manual : Engine stalling
Description
CHART 7: ENGINE STALLING
Diagnosis Procedure
1.CHECK FUEL
Check that the fuel reservoir is correctly filled and with the right fuel.
>> GO TO 2.
2.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT
Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis Procedure".
Is the inspection result normal? YES >> GO TO 3.
NO >> Repair or replace harness or connector.
3.CHECK WIRING HARNESS
Visually check the condition of the engine wiring harness.
Is the inspection result normal? YES >> GO TO 4.
NO >> Repair or replace harness or connector.
4.CHECK AIR INTAKE SYSTEM
Check air intake system. Refer to EM-280, "Removal and Installation".
Is the inspection result normal? YES >> GO TO 5.
NO >> Repair or replace air intake system.
5.CHECK ELECTRIC THROTTLE CONTROL ACTUATOR
Check electric throttle control actuator. Refer to EC-909, "Diagnosis Procedure".
Is the inspection result normal? YES >> GO TO 6.
NO >> Repair or replace.
6.CHECK MASS AIR FLOW SENSOR
Check mass air flow sensor. Refer to EC-902, "Component Inspection".
Is the inspection result normal? YES >> GO TO 7.
NO >> Repair or replace.
7.CHECK EGR SYSTEM
Check EGR system. Refer to EC-954, "Diagnosis Procedure".
Is the inspection result normal? YES >> GO TO 8.
NO >> Repair or replace.
8.CHECK CATALYTIC CONVERTER
Is the catalytic converter clogged or deteriorated? Is the inspection result normal? YES >> GO TO 9.
NO >> Repair or replace.
9.CHECK CAN COMMUNICATION
Perform trouble diagnosis on the CAN communication line using CONSULT-III. Refer to LAN-31, "CAN COMMUNICATION SYSTEM : CAN Communication Signal Chart".
Is the inspection result normal? YES >> GO TO 10.
NO >> Repair or replace harness or connector.
10.CHECK LOW PRESSURE CIRCUIT
Perform the TEST 1: LOW PRESSURE CIRCUIT CHECK. Refer to EC-867, "Work Procedure (TEST 1: Low Pressure Fuel Supply System Check)".
>> GO TO 11.
11.CHECK INTERNAL FUEL TRANSFER PUMP
Perform the TEST 2: INTERNAL FUEL TRANSFER PUMP CHECK. Refer to EC-868, "Work Procedure (TEST 2: Internal Fuel Transfer Pump Check)".
>> GO TO 12.
12.CHECK HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE)
Perform the TEST 3: HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE). Refer to EC-868, "Work Procedure [TEST 3: High Pressure Supply Pump (Pressure Control Valve) Check]".
>> GO TO 13.
13.CHECK HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE)
Perform the TEST 4: HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE). Refer to EC- 869, "Work Procedure [TEST 4: High Pressure Supply Pump (Volumetric Control Valve) Check]".
>> GO TO 14.
14.CHECK RAIL HIGH PRESSURE CONTROL CIRCUIT
Perform the TEST 5: RAIL HIGH PRESSURE CONTROL CIRCUIT CHECK. Refer to EC-871, "Work Procedure (TEST 5: Rail High Pressure Regulation Check)".
>> GO TO 15.
15.CHECK MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN
Perform the TEST 6: MAJOR LEAK IN FUEL INJECTOR/FUEL INJECTORS OPEN. Refer to EC-876, "Work Procedure (TEST 6: Fuel Injectors Leak Check)".
>> GO TO 16.
16.CHECK INCORRECT FUEL INJECTION QUANTITY
Perform the TEST 7: INCORRECT FUEL INJECTION QUANTITY. Refer to EC-877, "Work Procedure (TEST 7: Fuel Injection Quantity Check)".
>> INSPECTION END
Engine idle speed too low or unstable
Description
CHART 6: ENGINE IDLE SPEED TOO LOW OR UNSTABLE
Diagnosis Procedure
1.CHECK FUEL
Check that the fuel reservoir is correctly filled and with the right fuel.
>> GO TO 2.
2.CHE ...
No or very little acceleration, increase in engine speed
Description
CHART 8: NO OR VERY LITTLE ACCELERATION, INCREASE IN ENGINE SPEED
Diagnosis Procedure
1.CHECK FUEL
Check that the fuel reservoir is correctly filled and with the right fuel.
>> ...
Other materials:
Control linkage
Exploded View
1. Bracket
2. Selector cable
3. Shifter lever A
4. Selector lever
5. Cable mounting bracket
6. Tapping bolt
7. Shifter cable
8. Grommet
9. M/T shift selector assembly
10. Shifter lever
11. Shifter lever knob
: Always replace after every
disassembly.
: N·m (kg-m, ...
Additional service when replacing ECM
Description
When replacing ECM, this procedure must be performed.
Work Procedure
1.PERFORM INITIALIZATION OF NATS SYSTEM AND REGISTRATION OF ALL NATS
IGNITION KEY IDS
Refer to SEC-50, "BCM : Special Repair Requirement" (With intelligent key
system), SEC-190, "BCM : Work
Proce ...
B1148 curtain air bag module
DTC Logic
DTC DETECTION LOGIC
DTC CONFIRMATION PROCEDURE
1.CHECK SELF-DIAG RESULT
With CONSULT-III
1. Turn ignition switch ON.
2. Perform “Self Diagnostic Result” mode of “AIR BAG” using CONSULT-III.
Without CONSULT-III
1. Turn ignition switch ON.
2. Check the air bag warning lamp statu ...
