Nissan Juke Service and Repair Manual : Power supply and ground circuit

Diagnosis Procedure

1.CHECK ABS ACTUATOR AND ELECTRIC UNIT (CONTROL UNIT) IGNITION POWER SUPPLY

1. Turn the ignition switch OFF.

2. Disconnect ABS actuator and electric unit (control unit) harness connector.

3. Check voltage between ABS actuator and electric unit (control unit) harness connector and ground.

4. Turn the ignition switch ON


4. Turn the ignition switch ON CAUTION:
Never start engine

.

5. Check voltage between ABS actuator and electric unit (control unit) harness connector and ground.

Is the inspection result normal?


Is the inspection result normal? YES >> GO TO 3.

NO >> GO TO 2.

2.CHECK ABS ACTUATOR AND ELECTRIC UNIT (CONTROL UNIT) IGNITION POWER SUPPLY CIRCUIT

1. Turn the ignition switch OFF.

2. Check 10 A fuse (#57).

3. Disconnect IPDM E/R harness connector.

4. Check continuity between ABS actuator and electric unit (control unit) harness connector and IPDM E/R harness connector.

5. Check for continuity between ABS actuator and electric unit (control unit)


5. Check for continuity between ABS actuator and electric unit (control unit) harness connector and the ground.

Is the inspection result normal?


Is the inspection result normal? YES >> Perform trouble diagnosis for ignition power supply. Refer to PG-15, "Wiring Diagram - IGNITION POWER SUPPLY -".

NO >> Repair or replace error-detected parts.

3.CHECK MOTOR AND MOTOR RELAY POWER SUPPLY

1. Turn the ignition switch OFF.

2. Check voltage between ABS actuator and electric unit (control unit) harness connector and ground.

3. Turn the ignition switch ON.


3. Turn the ignition switch ON.

CAUTION:
Never start engine.

4. Check voltage between ABS actuator and electric unit (control unit) harness connector and ground.

Is the inspection result normal?


Is the inspection result normal? YES >> GO TO 5.

NO >> GO TO 4.

4.CHECK MOTOR AND MOTOR RELAY POWER SUPPLY CIRCUIT

1. Turn the ignition switch OFF.

2. Check 30 A fusible link (K).

3. Check continuity and short circuit between ABS actuator and electric unit (control unit) harness connector terminal (1) and 30 A fusible link (K).

Is the inspection result normal? YES >> Perform trouble diagnosis for battery power supply. Refer to PG-10, "Wiring Diagram - BATTERY POWER SUPPLY -".

NO >> Repair or replace error-detected parts.

5.CHECK ACTUATOR RELAY, ABS IN VALVE, ABS OUT VALVE POWER SUPPLY

1. Turn the ignition switch OFF.

2. Check voltage between ABS actuator and electric unit (control unit) harness connector and ground.

3. Turn the ignition switch ON


3. Turn the ignition switch ON CAUTION:
Never start engine.

4. Check voltage between ABS actuator and electric unit (control unit) harness connector and ground.

Is the inspection result normal?


Is the inspection result normal? YES >> GO TO 7.

NO >> GO TO 6.

6.CHECK ACTUATOR RELAY, ABS IN VALVE, ABS OUT VALVE POWER SUPPLY CIRCUIT

1. Turn the ignition switch OFF.

2. Check 40 A fusible link (F).

3. Check continuity and short circuit between ABS actuator and electric unit (control unit) harness connector terminal (2) and 40 A fusible link (F).

Is the inspection result normal? YES >> Perform trouble diagnosis for battery power supply. Refer to PG-10, "Wiring Diagram - BATTERY POWER SUPPLY -".

NO >> Repair or replace error-detected parts.

7.CHECK ABS ACTUATOR AND ELECTRIC UNIT (CONTROL UNIT) GROUND CIRCUIT

Check for continuity between ABS actuator and electric unit (control unit) harness connector and the ground.

Is the inspection result normal?


Is the inspection result normal? YES >> GO TO 8.

NO >> Repair or replace error-detected parts.

8.CHECK TERMINAL

• Check ABS actuator and electric unit (control unit) pin terminals for damage or loose connection with harness connector.

• Check IPDM E/R pin terminals for damage or loose connection with harness connector.

Is the inspection result normal? YES >> INSPECTION END

NO >> Repair or replace error-detected parts.

    U1010 control unit (can)
    Description CAN (Controller Area Network) is a serial communication line for real time application. It is an on-vehicle multiplex communication line with high data communication speed and excellen ...

    Stop lamp switch
    Component Function Check 1.CHECK STOP LAMP SWITCH OPERATION Depress brake pedal and check that stop lamp turns ON, or release brake pedal and check stop lamp turns OFF. Is the inspection resul ...

    Other materials:

    Seat belt extenders
    If, because of body size or driving position, it is not possible to properly fit the lap-shoulder belt and fasten it, an extender that is compatible with the installed seat belts is available that can be purchased. The extender adds approximately 8 in (200 mm) of length and may be used for eit ...

    P1553 battery current sensor
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If DTC Confirmation Procedure has been previously conducted, always perform the following before conducting the next test. 1. Turn ignition switch OFF and wait at least 10 seconds. 2. Turn ignition switch ON. 3. ...

    B1121 satellite sensor LH
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.CHECK SELF-DIAG RESULT With CONSULT-III 1. Turn ignition switch ON. 2. Perform “Self Diagnostic Result” mode of “AIR BAG” using CONSULT-III. Without CONSULT-III 1. Turn ignition switch ON. 2. Check the air bag warning lamp statu ...