Nissan Juke Service and Repair Manual : CVT shift lock system
Wiring diagram
For connector terminal arrangements, harness layouts, and alphabets in a
(option abbreviation; if
notdescribed
in wiring diagram), refer to GI-12, "Connector Information/Explanation of Option
Abbreviation".
CVT control system
Wiring diagram For connector terminal arrangements, harness layouts, and alphabets in a (option abbreviation; if notdescribed in wiring diagram), refer to GI-12, "Connector Information/Expl ...Basic inspection
...Other materials:
Sensor rotor
Front sensor rotor : Removal and Installatio
REMOVAL
Replace wheel hub as an assembly when replacing because sensor rotor cannot
be disassembled.
• MR16DDT: Refer to FAX-11, "Removal and Installation".
• HR16DE: Refer to FAX-43, "Removal and Installation".
• K9K: Refer t ...
B260F Engine status
Description
BCM receives the engine status signal from ECM via CAN communication.
DTC Logic
DTC DETECTION LOGIC
NOTE:
• If DTC B260F is displayed with DTC U1000, first perform the trouble diagnosis
for DTC U1000. Refer to
BCS-83, "DTC Logic".
• If DTC B260F is displayed with DTC U ...
P060B ECM
DTC Logic
DTC DETECTION LOGIC
Diagnosis Procedure
1.INSPECTION START
1. Turn ignition switch ON.
2. Erase DTC.
3. Turn ignition switch OFF and wait for 20 seconds.
4. Turn ignition switch ON and perform the self-diagnosis.
Is the DTC P060B displayed again?
YES >> GO TO 2.
NO &g ...