Nissan Juke Service and Repair Manual : Charge air cooler

Exploded View

1. Air inlet hose


1. Air inlet hose
2. Clamp
3. Air inlet tube
4. Air inlet hose
5. Charge air cooler
6. Air inlet hose
7. Air inlet tube
8. Turbocharger
9. Air inlet tube assembly

A. 1st step: 5.0 N·m (0.51 kg-m, 44 ft-lb) 2nd step: 7.0 N·m (0.71 kg-m, 62 ftlb) B. Paint mark
C. To electric throttle control actuator

: N·m (kg-m, ft-lb): Vehicle front
: N·m (kg-m, in-lb): N·m (kg-m, ft-lb)
Removal and Installation: N·m (kg-m, in-lb)


Removal and Installation

REMOVAL

1. Remove front bumper. Refer to EXT-12, "Exploded View".

2. Remove air guide (RH).

3. Remove air inlet hose between air inlet tube and charge air cooler.

4. Remove charge air cooler (1).

CAUTION:
• Avoid interference between the charge air cooler and radiator.

• When removing charge air cooler, close opening on turbo charger and intake manifold with shop cloth or other suitable material

.

INSTALLATION


INSTALLATION

Install in the reverse order of removal paying attention to the following points:
• Apply a neutral detergent (fluid) to the joint between hoses and pipes (oil is not permissible).

• Pay attention to identification mark and direction.

• When installing air inlet hoses and tubes. Refer to EM-281, "Removal and Installation".

Inspection

INSPECTION AFTER REMOVAL

1. Check that the charge air cooler is not full of oil. In that case, clean it with cleaning agent and then let it dry.

2. Check air passages of charge air cooler core and fins for clogging, leaks or deformation. Clean or replace charge air cooler in necessary.

• Be careful not to deform core fins.

• For cleaning procedure of charge air cooler core, refer to CO-59, "Inspection".

    Air cleaner and air duct
    Exploded View 1. Turbocharger air inlet pipe 2. Clamp 3. Air duct (suction) 4. Air mass flow sensor 5. O-ring 6. Air duct (inlet) 7. Grommet 8. Air cleaner case 9. Air cleaner filter ...

    EGR valve
    Exploded View 1. EGR valve assembly 2. Clamp 3. EGR tube 4. Air inlet tube 5. O-ring 6. Gasket 7. EGR cooler 8. Gasket 9. EGR volume control valve housing 10. Gasket 11. Electric t ...

    Other materials:

    Basic inspection
    DIAGNOSIS AND REPAIR WORK FLOW Work Flow DESCRIPTION OF TROUBLE DIAGNOSIS FLOWCHART DETAILS OF TROUBLE DIAGNOSIS FLOWCHART 1.OBTAIN INFORMATION ABOUT SYMPTOM Interview the customer to obtain as much information as possible about the conditions and environment under which the malfunction oc ...

    P1632 fuel cut off valve
    DTC Logic DTC DETECTION LOGIC Diagnosis Procedure 1.CHECK FUEL CUT OFF VALVE POWER SUPPLY CIRCUIT FOR OPEN AND SHORT 1. Turn ignition switch OFF. 2. Disconnect fuel cut off valve harness connector. 3. Turn ignition switch ON. 4. Check the voltage between fuel cut off valve harness connector ...

    Front combination lamp
    Exploded View REMOVAL 1. Front combination lamp : N·m (kg-m, in-lb) DISASSEMBLY 1. Parking lamp bulb 2. Parking lamp bulb socket 3. Front turn signal lamp bulb socket 4. Front turn signal lamp bulb 5. Front combination lamp housing Removal and Installation CAUTION: Disconnect the ...