Nissan Juke Service and Repair Manual : ABS warning lamp
Component Function Check
1.CHECK ABS WARNING LAMP FUNCTION
Check that ABS warning lamp in combination meter turns ON for approx. 1 second after ignition switch is turned ON.
CAUTION:
Never start engine.
Is the inspection result normal? YES >> INSPECTION END
NO >> Proceed to BRC-74, "Diagnosis Procedure".
Diagnosis Procedure
1.CHECK ABS ACTUATOR AND ELECTRIC UNIT (CONTROL UNIT) POWER SUPPLY AND GROUND CIRCUIT
Perform the trouble diagnosis for ABS actuator and electric unit (control unit) power supply and ground circuit.
Refer to BRC-64, "Diagnosis Procedure".
Is the inspection result normal? YES >> GO TO 2.
NO >> Repair or replace error-detected parts.
2.PERFORM SELF-DIAGNOSIS
With CONSULT-III.
Perform self-diagnosis for “ABS”.
Is any DTC detected? YES >> Check the DTC. Refer to BRC-31, "DTC Index".
NO >> GO TO 3.
3.CHECK ABS WARNING LAMP SIGNAL
With CONSULT-III.
1. Select “ABS”, “DATA MONITOR” and “ABS WARN LAMP” according to this order.
2. Turn the ignition switch OFF.
3. Check that data monitor displays “On” for approx. 1 second after ignition switch is turned ON and then changes to “Off”.
CAUTION:
Never start engine.
Is the inspection result normal? YES >> Check combination meter. Refer to MWI-23, "CONSULT-III Function".
NO >> Replace ABS actuator and electric unit (control unit). Refer to MWI-69, "Removal and Installation".
Brake fluid level switch
Component Function Check 1.CHECK BRAKE FLUID LEVEL SWITCH OPERATION When the brake fluid is full or empty. Then check that the brake warning lamp in the combination meter turns ON/OFF correctly. ...Brake warning lamp
Component Function Check 1.CHECK BRAKE WARNING LAMP FUNCTION (1) Check that brake warning lamp in combination meter turns ON for approx. 1 second after ignition switch is turned ON. CAUTION: ...Other materials:
EPS branch line circuit
Diagnosis Procedure
1.CHECK CONNECTOR
1. Turn the ignition switch OFF.
2. Disconnect the battery cable from the negative terminal.
3. Check the terminals and connectors of the EPS control unit for damage, bend
and loose connection (unit
side and connector side).
Is the inspection result no ...
Thermo control amplifier
Removal and Installation
REMOVAL
1. Remove evaporator.
• Refer to HA-55, "EVAPORATOR : Removal and Installation". (HR16DE)
• Refer to HA-115, "EVAPORATOR : Removal and Installation". (MR16DDT)
2. Remove the thermo control amp. from evaporator.
INSTALLATION
Note the fol ...
Performance test
Inspection
INSPECTION PROCEDURE
1. Connect recovery/recycling/recharging equipment (for HFC-134a) or manifold
gauge.
2. Start the engine, and set to the following condition.
Test condition
3. Maintain test condition until A/C system becomes stable. (Approximately 10
minutes)
4. Check t ...