Nissan Juke Service and Repair Manual : Service

Never use electrical test equipment to check SRS circuits unless instructed to in this Service Manual.

Before servicing the SRS, turn ignition switch OFF, disconnect battery negative terminal and wait at least 3 minutes.

For approximately 3 minutes after the battery negative terminal are removed, it is still possible for the air bag and seat belt pre-tensioner to deploy. Therefore, never work on any SRS connectors or wires until at least 3 minutes have elapsed.

Diagnosis sensor unit must always be installed with their arrow marks pointing towards the front of the
pointing towards the front of the vehicle for proper operation. Also check diagnosis sensor unit for cracks, deformities or rust before installation and replace as required.

The spiral cable must be aligned in the neutral position since its rotations are limited. Never turn steering wheel and column after removal of steering gear.

Handle air bag module carefully. Always place driver and front passenger air bag modules with the pad side facing upward and seat mounted front side air bag module standing with the stud bolt side facing down.

Conduct self-diagnosis to check entire SRS for proper functioning after replacing any components.

After air bag inflates, the front instrument panel assembly should be replaced if damaged.

Always replace instrument panel pad following front passenger air bag deployment.

    Precaution for Disposal
    Before disposing of air bag module, pop-up roll bar and seat belt pre-tensioner, or vehicles equipped with such systems, deploy the systems. If such systems have already been deployed due to an ...

    Preparation
    Special Service Tool Commercial Service Tools ...

    Other materials:

    Precaution Necessary for Steering Wheel Rotation after Battery Disconnect
    NOTE: Before removing and installing any control units, first turn the ignition switch to the LOCK position, then disconnect both battery cables. After finishing work, confirm that all control unit connectors are connected properly, then re-connect both battery cables. Always use CONS ...

    Wiring diagram
    NISSAN DYNAMIC CONTROL SYSTEM Wiring Diagram For connector terminal arrangements, harness layouts, and alphabets in a (option abbreviation; if not described in wiring diagram), refer to GI-12, "Connector Information/Explanation of Option Abbreviation". ...

    ABS branch line circuit
    Diagnosis Procedure 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the terminals and connectors of the ABS actuator and electric unit (control unit) for damage, bend and loose connection (unit side and connector side). ...