Nissan Juke Service and Repair Manual : P1610 lock mode

Description

ECM forcibly switches to the mode that inhibits engine start, when engine start operation is performed 5 times or more while communication between ECM and BCM is not normal.

DTC Logic

DTC DETECTION LOGIC

DTC CONFIRMATION PROCEDURE


DTC CONFIRMATION PROCEDURE

1.PERFORM DTC CONFIRMATION PROCEDURE

1. Turn ignition switch ON.

2. Check DTC in “Self Diagnostic Result” mode of “ENGINE” using CONSULT-III.

Is DTC detected? YES >> Go to SEC-52, "Diagnosis Procedure".

NO >> INSPECTION END

Diagnosis Procedure

1.CHECK ENGINE START FUNCTION

1. Check that DTC except for DTC P1610 is not detected.

If detected, erase the DTC after fixing.

2. Turn ignition switch OFF.

3. Contact the registered Intelligent Key backside to push-button ignition switch and wait 5 seconds.

4. Turn ignition switch ON.

5. Turn ignition switch OFF and wait 5 seconds.

6. Repeat steps 3 and 5 twice (a total of 3 times).

7. Check that engine can start.

>> INSPECTION END

    P1611 ID discord, IMMU-ECM
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PERFORM DTC CONFIRMATION PROCEDURE 1. Turn ignition switch ON. 2. Check DTC in “Self Diagnostic Result” mode of “ENGINE” using CONSULT ...

    Other materials:

    C1120, C1122, C1124, C1126 ABS in valve system
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn ignition switch OFF and wait at least 10 seconds before conducting the next test. >> GO TO 2. 2.CHECK DTC DETECTION With CONSULT ...

    LAN System can system (type 7)
    DTC/CIRCUIT DIAGNOSIS Main line between IPDM-E and DLC circuit Diagnosis Procedure 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the following terminals and connectors for damage, bend and loose connection (connector s ...

    Removal and Installation Procedure for CVT Unit Connector
    REMOVAL • Rotate bayonet ring (A) counterclockwise. Pull out CVT unit harness connector (B) upward and remove it. INSTALLATION 1. Align marking (A) on CVT unit harness connector terminal with marking (B) on bayonet ring. Insert CVT unit harness connector. 2. Rotate bayonet ring clockwise. ...