Nissan Juke Service and Repair Manual : General Specifications

Preload Torque


    Other materials:

    P0697 sensor power supply
    DTC Logic DTC DETECTION LOGIC Diagnosis Procedure 1.CHECK GROUND CONNECTION 1. Turn ignition switch OFF and wait at least 4 minutes. 2. Check ground connection E38. Refer to Ground Inspection in GI-44, "Circuit Inspection". Is the inspection result normal? YES >> GO TO 2 ...

    Service Notice or Precautions for Steering System
    In case of removing steering gear assembly, make the final tightening with grounded and unloaded vehicle condition, and then check wheel alignment. Observe the following precautions when disassembling. - Before disassembly, thoroughly clean the outside of the unit. - Disassembly should b ...

    Push-button ignition switch illumination circuit
    Description Provides the power supply and the ground to control the push-button ignition switch illumination. Component Function Check 1.CHECK PUSH-BUTTON IGNITION SWITCH ILLUMINATION OPERATION CONSULT-III ACTIVE TEST 1. Turn the ignition switch ON. 2. Select ENGINE SW ILLUMI of BCM (INTEL ...