Nissan Juke Service and Repair Manual : Diagnosis Procedure

WARNING:
• Before servicing, turn ignition switch OFF, disconnect battery negative terminal and wait at least 3 minutes. (To discharge backup capacitor.) • Never use unspecified tester or other measuring device.

1.CHECK HARNESS CONNECTOR

Check the harness connector.

Is the inspection result normal? YES >> GO TO 2.

NO >> Replace harness connector.

2.CHECK WIRING HARNESS

Check the wiring harness externals.

Is the inspection result normal? YES >> GO TO 3.

NO >> Replace wiring harness.

3.REPLACE LAP PRE-TENSIONER LH

1. Replace lap pre-tensioner LH. Refer to SR-33, "Removal and Installation".

2. Perform DTC confirmation procedure. Refer to SRC-130, "DTC Logic".

Is DTC detected? YES >> GO TO 4.

NO >> INSPECTION END

4.REPLACE AIR BAG DIAGNOSIS SENSOR UNIT

1. Replace air bag diagnosis sensor unit. Refer to SR-30, "Removal and Installation".

2. Perform DTC confirmation procedure. Refer to SRC-130, "DTC Logic".

Is DTC detected? YES >> GO TO 1.

NO >> INSPECTION END

    B1177 lap Pre-tensioner RH
    DTC Logic DTC CONFIRMATION PROCEDURE 1.CHECK SELF-DIAGNOSTIC RESULT With CONSULT-III 1. Turn ignition switch ON. 2. Perform “Self Diagnostic Result” mode of “AIR BAG” using CONSULT-III. With ...

    B1178 lap Pre-tensioner RH
    DTC Logic DTC CONFIRMATION PROCEDURE 1.CHECK SELF-DIAGNOSTIC RESULT With CONSULT-III 1. Turn ignition switch ON. 2. Perform “Self Diagnostic Result” mode of “AIR BAG” using CONSULT-III. With ...

    Other materials:

    P0605 ECM
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If DTC Confirmation Procedure has been previously conducted, always turn ignition switch OFF and wait at least 10 seconds before conducting the next test. >> GO TO 2. 2.PERFORM DTC CONFIRMATION PROCEDURE ...

    Temperature A, B and C
    The temperature grades A (the highest), B, and C, representing the tire’s resistance to the generation of heat and its ability to dissipate heat when tested under controlled conditions on a specified indoor laboratory test wheel. Sustained high temperature can cause the material of the tire to ...

    MR16DDT : Inspection and Adjustment
    INSPECTION Magnetic Switch Check • Before starting to check, disconnect the battery cable from the negative terminal. • Disconnect “M” terminal of starter motor. 1. Continuity test [between “S” terminal (A) and switch body] B : “B” terminal C : “M” terminal • Replace magnetic switch if co ...