Nissan Juke Service and Repair Manual : Cylinder Block
*: After installing in connecting rod
Cylinder head
Valve Guide
...
Main Bearing
...
Other materials:
C1143 steering angle sensor
DTC Logic
DTC DETECTION LOGIC
DTC CONFIRMATION PROCEDURE
1.PRECONDITIONING
If “DTC CONFIRMATION PROCEDURE” has been previously conducted, always turn
ignition switch OFF and
wait at least 10 seconds before conducting the next test.
>> GO TO 2.
2.CHECK DTC DETECTION
With CONSULT ...
Battery inspection
How to Handle Battery
CAUTION:
• If it becomes necessary to start the engine with a booster battery and jumper
cables, use a 12-volt
booster battery.
• After connecting battery cables, ensure that they are tightly clamped to
battery terminals for good
contact.
• Never add distilled water t ...
EPS branch line circuit
Diagnosis Procedure
1.CHECK CONNECTOR
1. Turn the ignition switch OFF.
2. Disconnect the battery cable from the negative terminal.
3. Check the terminals and connectors of the EPS control unit for damage, bend
and loose connection (unit
side and connector side).
Is the inspection result no ...