Nissan Juke Service and Repair Manual : C1121, C1123, C1125, C1127 ABS out valve system

DTC Logic

DTC DETECTION LOGIC

DTC CONFIRMATION PROCEDURE


DTC CONFIRMATION PROCEDURE

1.PRECONDITIONING

If DTC CONFIRMATION PROCEDURE has been previously conducted, always turn ignition switch OFF and wait at least 10 seconds before conducting the next test.

>> GO TO 2.

2.CHECK DTC DETECTION

1. Turn the ignition switch OFF to ON.With CONSULT-III


1. Turn the ignition switch OFF to ON.

2. Perform self-diagnosis for ABS.

Is DTC C1121, C1123, C1125 or C1127 detected? YES >> Proceed to BRC-58, "Diagnosis Procedure".

NO >> INSPECTION END

Diagnosis Procedure

1.CHECK CONNECTOR

1. Turn the ignition switch OFF.

2. Check ABS actuator and electric unit (control unit) harness connector for disconnection or looseness.

Is the inspection result normal? YES >> GO TO 3.

NO >> Repair or replace error-detected parts, securely lock the connector, and GO TO 2.

2.PERFORM SELF-DIAGNOSIS

Perform self-diagnosis for ABS again.

Is DTC C1121, C1123, C1125 or C1127 detected? YES >> GO TO 3.

NO >> INSPECTION END

3.CHECK ABS OUT VALVE POWER SUPPLY

1. Turn the ignition switch OFF.

2. Disconnect ABS actuator and electric unit (control unit) harness connector.

3. Check voltage between ABS actuator and electric unit (control unit) harness connector and ground.

4. Turn the ignition switch ON.


4. Turn the ignition switch ON.

CAUTION:
Never start engine.

5. Check voltage between ABS actuator and electric unit (control unit) harness connector and ground.

Is the inspection result normal?


Is the inspection result normal? YES >> GO TO 5.

NO >> GO TO 4.

4.CHECK ABS OUT VALVE POWER SUPPLY CIRCUIT

1. Turn the ignition switch OFF.

2. Check 40 A fusible link (F).

3. Check continuity and short circuit between ABS actuator and electric unit (control unit) harness connector terminal (2) and 40 A fusible link (F).

Is the inspection result normal? YES >> Perform trouble diagnosis for battery power supply. Refer to PG-10, "Wiring Diagram - BATTERY POWER SUPPLY -".

NO >> Repair or replace error-detected parts.

5.CHECK ABS OUT VALVE GROUND CIRCUIT

1. Turn the ignition switch OFF.

2. Check continuity between ABS actuator and electric unit (control unit) harness connector and the ground.

Is the inspection result normal?


Is the inspection result normal? YES >> GO TO 6.

NO >> Repair or replace error-detected parts.

6.CHECK TERMINAL

Check ABS actuator and electric unit (control unit) pin terminals for damage or loose connection with harness connector.

Is the inspection result normal? YES >> Replace ABS actuator and electric unit (control unit). Refer to BRC-90, "Removal and Installation".

NO >> Repair or replace error-detected parts.

    C1120, C1122, C1124, C1126 ABS in valve system
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If DTC CONFIRMATION PROCEDURE has been previously conducted, always turn ignition switch OFF and wait at least 10 ...

    C1140 actuator relay system
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.PRECONDITIONING If DTC CONFIRMATION PROCEDURE has been previously conducted, always turn ignition switch OFF and wait at least 10 ...

    Other materials:

    Basic inspection
    DIAGNOSIS AND REPAIR WORKFLOW Work Flow OVERALL SEQUENCE DETAILED FLOW 1.INTERVIEW FOR MALFUNCTION Interview the symptom to the customer. >> GO TO 2. 2.SYMPTOM CHECK Check the symptom from the customer's information. >> GO TO 3. 3.BASIC INSPECTION Check the operation o ...

    B1150 curtain air bag module LH
    DTC Logic DTC DETECTION LOGIC DTC CONFIRMATION PROCEDURE 1.CHECK SELF-DIAG RESULT With CONSULT-III 1. Turn ignition switch ON. 2. Perform Self Diagnostic Result mode of AIR BAG using CONSULT-III. Without CONSULT-III 1. Turn ignition switch ON. 2. Check the air bag warning lamp statu ...

    Line pressure test
    Inspection and Judgment INSPECTION Line Pressure Test Port Line Pressure Test Procedure 1. Inspect the amount of engine oil and replenish if necessary. 2. Drive the car for about 10 minutes to warm it up so that the CVT fluid reaches in the range of 50 to 80C (122 to 176F), then inspect ...