Nissan Juke Service and Repair Manual : Battery terminal with fusible link
Exploded View
1 : Battery terminal with fusible link 2 : Harness connector
: N·m (kg-m, ft-lb)
Removal and Installation
REMOVAL
1. Disconnect the battery cable from the negative terminal.
2. Remove cover of battery positive terminal.
3. Remove harness mounting nut and battery terminal with fusible link mounting nut.
4. Disconnect harness connector and remove battery terminal with fusible link.
INSTALLATION
Install in the reverse order of removal.
Battery
Exploded View
1 : Battery fix frame
:N·m (kg-m, in-lb)
Removal and Installation
REMOVAL
1. Disconnect the battery cable from the negative terminal.
CAUTION:
When disconnecting, disconnect t ...
Service data and specifications (SDS)
Battery
...
Other materials:
Precaution for Liquid Gasket
REMOVAL OF LIQUID GASKET
• After removing the mounting bolts and nuts, separate the mating
surface using a seal cutter and remove the liquid gasket.
CAUTION:
Be careful not to damage the mating surfaces.
• In areas where the cutter is difficult to use, use a plastic hammer to
lightly tap the ...
Engine bucking
Description
CHART 9: ENGINE BUCKING
Diagnosis Procedure
1.CHECK ECM POWER SUPPLY AND GROUND CIRCUIT
Check ECM power supply and ground circuit. Refer to EC-885, "Diagnosis
Procedure".
Is the inspection result normal?
YES >> GO TO 2.
NO >> Repair or replace harness o ...
P1553 battery current sensor
DTC Logic
DTC DETECTION LOGIC
DTC CONFIRMATION PROCEDURE
1.PRECONDITIONING
If DTC Confirmation Procedure has been previously conducted, always perform
the following before conducting
the next test.
1. Turn ignition switch OFF and wait at least 10 seconds.
2. Turn ignition switch ON.
3. ...